Session #62 802.16 NRR Committee Closing Report

advertisement
Session #62 802.16 NRR Committee Closing Report
IEEE 802.16 Presentation Submission Template (Rev. 9)
Document Number:
IEEE 802.16-09/0040r1
Date Submitted:
2009-07-16
Source:
Arnaud Tonnerre
THALES
Arthur Wang
LinQuest
Voice:
E-mail:
Voice:
E-mail:
+33 1 46 13 28 50
arnaud.tonnerre@fr.thalesgroup.com
+1-323-924-1502
arthur.wang@linquest.com
Venue:
IEEE 802.16 Session #62
Base Contribution:
N/A
Purpose:
For review
Notice:
This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in
the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material
contained herein.
Release:
The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an
IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s
sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this
contribution may be made public by IEEE 802.16.
Patent Policy:
The contributor is familiar with the IEEE-SA Patent Policy and Procedures:
<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.
Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
1
Session #62
NRR
Working Group Ad Hoc Committee
Closing Report
July 16, 2009
2
NRR Ad Hoc Committee
• In November 2008, the 802.16 Working Group has
approved the creation of a WG Ad Hoc Committee with the
objective of promoting discussion on robustness and
reliability
• Committee reflector and document upload area
– http://dot16nrr-reflector.wirelessman.org
– http://dot16nrr.wirelessman.org
• Study the potential interest of the WG to launch a new
standardization activity for a highly-reliable and highlyrobust 802.16 system
3
Activities of the week
• 2 sessions have been planned during the week
– Wednesday morning (presentation of contributions)
– Wednesday afternoon (discussion of project
requirements)
• Participation
– Attendees : 10
– Represented companies: LinQuest, France Telecom,
InterDigital, Alvarion, BAE, PureWave, I2R
• NRR project requirement defined
4
NRR Report
• Reviewed proposed text in contributions;
• Reviewed multiple potential approaches to address the
project requirements.
• Reviewed existing standards to identify project requirements
were not covered.
• Added agreed project requirements to the NRR report
(80216nrr-08_004r3)
5
Project Requirements
•
•
•
•
•
•
Ability to operate without an attached infrastructure;
Local forwarding by relay stations (MS-RS-MS);
Capability of dynamic self reconfiguration;
End-to-End Path redundancy;
Enhancement to Mobile Relay Station;
Security enhancement as required by above features
Motion
• Motion for extending the NRR Ad Hoc to Nov 2009
session to work on draft PAR and top level technical
approaches.
•
Move
Second
Decision
7
Backup Chart
8
Activities since the NRR creation
• Meetings have been planned at the 3 previous sessions
• A reflector has been used for discussions in-between sessions
– 65 members
• 5 conference calls
• A report has been drafted
• New members to be appended