Carsten Hast
SLAC National Accelerator Laboratory
National User Facilities are DOE’s research flag ships and provide excellent infrastructure to the community (funding)
Your FACET User Organization will be there to help
FACET proposals are reviewed by SAREC
FACET User Meeting August 2011 2
S LAC A ccelerator R esearch E xperimental program C ommittee
» Appointed by Accelerator Research Division Head
SAREC Charge:
»
»
»
Evaluate the merit of proposed R&D in SLAC’s experimental accelerator research facilities for advancing world-class accelerator science or accelerator technology
Evaluate the feasibility of proposed R&D in SLAC’s accelerator research facilities
Review the progress of existing R&D in SLAC’s accelerator research facilities
1 st SAREC Review was January 10 th - 12 th 2011
2 nd SAREC Review in January 2012 (2 days)
FACET User Meeting August 2011 3
»
»
»
For each SAREC review present status, achievements, publications and plans
» You can assume that SAREC members will remember your experiments, so only a short introduction will be needed
» Submit a Request for Beam Time (by November 15th)
Describe major changes in sufficient details
Technical changes will be evaluated by FACET Division
Prepare a talk for the SAREC meeting
Both, achievements and plans will be evaluated by SAREC
»
»
SAREC will give preference to continuing experiments
But run time is not guaranteed
FACET User Meeting August 2011 4
Prepare written proposal outlining your experiment (detailed)
»
»
»
»
Physics
Personnel
Detailed experimental description
Submit by deadline (October 15th)
Evaluation by FACET Division (FD) for safety and executabilty
» If necessary PIs are asked for additional information
» FD will prepare non judgmental statements to SAREC
Present to SAREC
SAREC will prepare written evaluations
Run time is allocated by the FACET Division following
SAREC’s evaluation, recommendation and practical considerations
FACET User Meeting August 2011 5
Prepare written proposal outlining your experiment (short)
»
»
»
»
Physics
Personnel
Detailed experimental description
Submit to FACET Division Director anytime
Evaluation by FACET Division for safety and executabilty
» If necessary PIs are asked for additional information
Short beam time requests will be granted by FACET Division
You might be asked to present your research at a future User or SAREC meeting
FACET User Meeting August 2011 6
Prepare written LoI outlining your experiment
»
»
»
»
Physics
Personnel
Experimental description (as much as you know)
Submit by November 15th
Evaluation by FACET Division for safety and executabilty
» If necessary PIs are asked for additional information
Present to SAREC
If appropriate, SAREC will prepare written evaluations
FACET User Meeting August 2011 7
Detailed technical evaluation by FACET Division (FD)
Experimental Readiness Review
» Safety
»
»
»
»
Ways to combine with existing infrastructure
Enough personnel for operation etc.
Your timely cooperation with FD is most necessary
Before operation
» PI will sign that his/her experiment is ready to receive beam and that it is safe to do so
» Operations Manager will sign that all necessary personnel is available and trained
» FACET Division Director will sign that the experiment is safe, poses no harm to the facility or others and is ready to go
FACET User Meeting August 2011 8