FTK Rear Transition Module Production Readiness Review The University of Chicago Mircea Bogdan

advertisement
FTK Rear Transition Module
Production Readiness Review
Mircea Bogdan
The University of Chicago
March 9, 2015
1
FTK Rear Transition Module
PCB modification:
- Include +5V LDO -> no need of VME 5V.
- Change width of one PCB 3.3V trace.
Prototype Rev. B – 3 pieces finished 7/15/2014
Mircea Bogdan, March 9, 2015
2
FTK Rear Transition Module
Production Plans
We plan to order the PCBs and the all the components, and send the kit to the assembly house
for manufacturing. The FPGAs were ordered on Dec.29, 2014, and have been shipped.
We plan to make the 22 PCBs with EPEC who made the prototypes as well.
We plan to do the assembly (20 modules) with Twin Hunter, who made the prototypes as well.
•Manufacturer will perform Automatic Optical Inspection (checks for component placement).
•Manufacturer will perform 5DX Check – Stereolithographic X-Ray inspection of solder connections.
•There will be a First Article (two modules) that will be shipped to us for a 1-week testing.
Mircea Bogdan, March 9, 2015
3
FTK Rear Transition Module – Docs
• Schematics http://edg.uchicago.edu/~bogdan/FTK_Rear_Transition_Module/schematicsB.html
• Layout http://edg.uchicago.edu/~bogdan/FTK_Rear_Transition_Module/layoutB.html
Notes:
The Schematics page has links to all schematics;
The Layout page has links to the specification drawing, assembly drawings, neutral file, net lengths file, Gerber files, plots of Gerber files, BOM
file with manufacturing instructions.
Mircea Bogdan, March 09, 2015
4
Download