Two Rotaries – VISSIM Simulations 77 | April 2, 2015

advertisement
Two Rotaries – VISSIM
Simulations
77 | April 2, 2015
LOS E & F Summary Table.
78 | April 2, 2015
Crash Analysis Locations.
79 | April 2, 2015
HSIP Crash Locations.
Highway Safety Improvement Program.
Weighted Rank.
EPDO – Equivalent Property Damage Only
(10, 5, 1).
Located crashes (crash reports) within 200
feet of each are clustered.
80 | April 2, 2015
HSIP Crash Analysis Locations.
81 | April 2, 2015
82 | April 2, 2015
83 | April 2, 2015
84 | April 2, 2015
85 | April 2, 2015
86 | April 2, 2015
87 | April 2, 2015
88 | April 2, 2015
89 | April 2, 2015
90 | April 2, 2015
91 | April 2, 2015
92 | April 2, 2015
93 | April 2, 2015
LOS E & F Summary Table HSIP
94 | April 2, 2015
Cape-wide and study area
transit service
95 | April 2, 2015
Total Annual CCRTA Ridership.
96 | April 2, 2015
Annual Fixed-Route Ridership.
97 | April 2, 2015
The Bourne Run.
98 | April 2, 2015
The Sandwich Line.
99 | April 2, 2015
Bus and Train Alternatives to
Reach Cape Cod
100 | April 2, 2015
Sevice Providers.
•
MBTA – Cape Cod Flyer,
•
Plymouth and Brockton, and
•
Peter Pan.
101 | April 2, 2015
Cape Flyer
•
Ridership: May – Columbus Day 2013 –
15,000.
•
Ridership: May – September 2014 –
12,625.
102 | April 2, 2015
Daily Average Ridership Crossing Bridge.
103 | April 2, 2015
Park and Ride Lots.
104 | April 2, 2015
Bicycles and Pedestrians
105 | April 2, 2015
Bicycle Facilities.
Photos by New England District of the U.S. Army Corps of Engineers - Flickr.
Licensed under CC BY 2.0 via Wikimedia Commons.
www.flickr.com/photos/corpsnewengland/4977261709 &
www.flickr.com/photos/corpsnewengland/4977262933
106 | April 2, 2015
Bicycle Facilities.
Photos by New England District of the U.S. Army Corps of Engineers - Flickr. Licensed under CC BY 2.0 via Wikimedia
Commons. www.flickr.com/photos/corpsnewengland/4977261709 & www.flickr.com/photos/corpsnewengland/4977262933
107 | April 2, 2015
Pedestrian and Bicycle Volumes.
108 | April 2, 2015
Questions?
Comments and feedback can be emailed to
Ethan Britland - ethan.britland@state.ma.us
109 | April 2, 2015
Schedule and Next Steps
110 | April 2, 2015
Study Schedule.
111 | April 2, 2015
Study Schedule.
112 | April 2, 2015
Next Steps.
•
Public Meeting April 16 at Mass Maritime
(7:00 pm to 9:00 pm).
•
Project and analyze 2035 No-Build Traffic
Volumes.
Complete economic analysis.
Begin consideration of improvement
alternatives.
•
•
113 | April 2, 2015
Questions?
Comments and feedback can be emailed to
Ethan Britland - ethan.britland@state.ma.us
114 | April 2, 2015
Download