November 7, 2011 Ratification: Construction Change Orders Page 1 of 2

advertisement
31
AGENDA ITEM BACKGROUND
TO: GOVERNING BOARD
DATE
FROM: PRESIDENT
SUBJECT:
November 7, 2011
Ratification: Construction Change Orders
REASON FOR BOARD CONSIDERATION
ACTION
ITEM NUMBER
ENCLOSURE(S)
Page 1 of 2
A.3
BACKGROUND: DRAFT
In accordance with Board Policy 4155, the attached change orders over $25,000 and less than 10% of the
original contract value are submitted for Governing Board ratification.
Continued on page 2
FISCAL IMPACT:
$4,660 out of project contingency.
RECOMMENDATION: It is recommended that the Governing Board ratify the construction change
orders provided as an attachment.
Administrator Initiating Item:
Joe Nugent
Victoria Lewis
Academic and Professional Matter
If yes, Faculty Senate Agreement
Senate President Signature
 Yes  No
 Yes  No
Final Disposition
Approved
32
Ratification: Construction Change Orders: cont.
Project
Green
Tech Center
Change order #
Contractor
Dilbeck
Amount
0 Total Change Order
Green Technology Center
Project
Allied
Health Sidewalk
Reconfiguration
Change order #
PCO 001
Allied Health
Total All Change Orders
Description
Contractor
Earthworks
Amount
Description
Undesireable soil conditions were found at the ADA ramp and needed
to be removed and class II baserock imported. Also additional dirt was
4,660 required to create a 2:1 slope to avoid having to build a retaining wall.
4,660 Total Change Order
0
Note: These change orders are reflected in the Facilities Master Plan (FMP) Status Report.
Download