Incident Name:__________________________ Finance - Time Unit Review Checklist
Host Agency:____________________ [Use the guide to Review you packages before processing]
PTRC / TIME
Information
Name:
Review date:
Position:
IMT / FSC / IBA:
OVERHEAD
For all responders.
CTR for each day.
Travel time on 1st & last CTR
Hazard Pay justified in remarks
All CTRs signed by supervisor
Resource Request Number on
CTR
Hours posted correctly from CTR to
Firefighter Time Report (OF-288)
If on multiple incidents, are they
properly separated and identified
Is the incident information on the OF-288
complete and correct & does it match the
Resource Order
ADs (Casuals) and EFFs – Emergency Firefighters
Review federal and or
state procedures.
A copy of the Resource Order is
attached
The Single Resource Casual Hire
Information Form is included (For
Federal AD’s)
The header information on the OF288 is complete and correct
(including Return Travel
Authorized)
All days are properly posted to the
OF-288
FS AD Travel is posted to the OF288 (if meets ASC criteria)
Authorizing documentation is attached for
AD rate field changes
Return travel is properly documented or
estimated
All required signatures are in place in
other-than-black ink
The USFS - AD Travel reimbursement
process has been properly posted
(instructions can be found at the FS
Incident Business web:
http://www.fs.fed.us/fire/ibp/)
All Agency CREWS: (Federal & State – NOT CONTRACT CREWS)
In addition to the
All-responder bullets
above
The crew roster matches the
Crew boss time is properly posted
I-Suite input (manual or ROSS)
correctly for each crew member: crew
boss may have additional hours.
End date and time for crew
members who demobed early
I-Suite Kind Code for the crew AND
has been properly posted
for each Crewmember is appropriate
Confirm! How State handcrews are
to be invoiced: individual OF-288’s
or Contract Crew OF-286.
COMP / CLAIMS:
Be very careful about
what documentation
remains in the package
follow direction in the
IIBMHB Chapter 10
All medical forms have been processed
according to agency policy
The M-Log is current and filed in the
Finance package
All existing and potential
Claims have been presented
to a contracting officer and
file copies are left in the
Finance package
COMPUTERS & PII
All I-Suite security procedures for transition have been followed; and is all PII information secured
NRCG-C40
Time Unit Review Checklist