DEPARTMENT OF THE AIR FORCE FISCAL YEAR (FY) 2010 Budget Estimates

advertisement
DEPARTMENT OF THE AIR FORCE
FISCAL YEAR (FY) 2010 Budget Estimates
May 2009
OPERATION AND MAINTENANCE, AIR FORCE
VOLUME II
TABLE OF CONTENTS
Volume 2 - Data Book
Env-30A Defense Environmental Restoration Program ................................................................................................................................... 1
Env-30B Defense Environmental Restoration Program ................................................................................................................................... 2
Env-30C Defense Environmental Restoration Program ................................................................................................................................... 6
OP-30 Depot Maintenance Program ................................................................................................................................................................ 7
OP-31 Spares and Repair Parts ....................................................................................................................................................................... 8
OP-34 Appropriated Fund Support for Morale, Welfare, and Recreation Activities.......................................................................................... 10
PB-15 Advisory and Assistance Services......................................................................................................................................................... 12
PB-22 Management Department Of Defense Headquarters Activities............................................................................................................. 13
PB-24-ACSC Professional Military Education .................................................................................................................................................. 14
PB-24-AFIT Professional Military Education..................................................................................................................................................... 17
PB-24-AWC Professional Military Education .................................................................................................................................................... 20
PB-24-SNCOA Professional Military Education................................................................................................................................................ 23
PB-24-SOC Professional Military Education..................................................................................................................................................... 26
PB-28 Summary of Budgeted Environmental Programs .................................................................................................................................. 29
PB-28A Summary of Budgeted Environmental Programs ................................................................................................................................ 35
PB-28B Summary of Budgeted Environmental Programs ................................................................................................................................ 36
PB-31Q Manpower Changes in FTEs .............................................................................................................................................................. 37
PB-34A Revenue from Leasing Out DoD Assets ............................................................................................................................................. 46
PB-34B Proceeds from Transfer or Disposal of DoD Real Property ................................................................................................................ 47
PB-55 Internation Military Headquarters........................................................................................................................................................... 49
Air Sovereignty Alert Exhibit ............................................................................................................................................................................. 50
i
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
FUNDING BY PRIORITIES
ENV30 Part 1
Class
U
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
FUDS
No
No
No
No
No
No
No
No
No
No
FundSource
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
ProgramManagementActivity
Management
Work Years
ATSDR
DSMOA
Fines
Management
Work Years
ATSDR
DSMOA
Fines
1
FY2008
$21,290
$10,482
0
13,319
$0
$0
$0
0
0
$0
FY2009
$34,719
$9,451
0
3,299
$0
$0
$0
0
0
$0
FY2010
$28,028
$9,979
400
11,000
$0
$0
$0
0
0
$0
FY2011 FY2012 FY2013
FY2014 FY2015 BalanceToComplete
$27,291 $30,152
$36,273 $38,924 $39,517
$75,043
$10,180
$5,593
$5,446 $3,984 $3,982
$34,085
400
0
0
0
0
0
11,000
10,000
9,000
9,000
8,000
0
$0
$0
$0
$0
$0
$0
$0
$5,259
$1,364
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
Exhibit ENV-30A Funding by Priorities
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
FUNDING BY WORK PHASE
ENV30 Part 2
Class
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
FUDS
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
FundSource
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
Environmental Restoration-IRP
CleanUpAction
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Assessments
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Remedial Designs
RiskMSRPPLevel
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
High Relative Risk
RiskMSRPPType
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
2
SiteFunding
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
FY2008
8
$390
$0
4
$0
$0
21
$1,136
$0
19
$0
$0
1
$935
$0
10
$0
$0
9
$3,811
$0
7
$21
$0
105
$23,950
$0
217
$3,418
$0
142
$20,502
$0
312
$2,884
$0
1
$3,987
$0
28
$0
$0
5
$0
$4,301
1
$0
$51
59
$0
$19,725
47
$0
$1,250
58
$0
$15,049
54
$0
$2,281
1
$0
$337
14
$0
$1,251
5
FY2009
8
$1,053
$0
2
$0
$0
20
$2,761
$0
13
$0
$0
0
$0
$0
8
$0
$0
9
$2,590
$0
6
$119
$0
101
$13,151
$0
161
$1,303
$0
148
$7,506
$0
246
$3,316
$0
0
$1,130
$0
28
$3,680
$0
5
$0
$3,524
0
$0
$0
60
$0
$16,164
32
$0
$0
55
$0
$24,146
42
$0
$1,962
1
$0
$1,079
13
$0
$0
5
FY2010
1
$0
$0
1
$0
$0
13
$0
$0
5
$0
$0
0
$0
$0
5
$128
$0
6
$0
$0
5
$0
$0
76
$6,485
$0
91
$297
$0
100
$4,319
$0
166
$46
$0
1
$197
$0
27
$119
$0
4
$0
$7,266
0
$0
$337
48
$0
$19,734
13
$0
$0
44
$0
$6,728
31
$0
$1,517
1
$0
$3,990
3
$0
$0
6
FY2011
0
$0
$0
0
$0
$0
0
$0
$0
4
$0
$0
0
$0
$0
2
$0
$0
0
$0
$0
0
$0
$0
20
$0
$0
14
$0
$0
43
$122
$0
56
$64
$0
0
$0
$0
6
$4,078
$0
1
$0
$0
0
$0
$392
26
$0
$6,644
7
$0
$0
33
$0
$9,564
7
$0
$0
0
$0
$0
0
$0
$0
2
FY2012
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
5
$679
$0
18
$109
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
7
$0
$2,021
3
$0
$0
0
$0
$0
0
$0
$0
0
FY2013
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$35
0
$0
$0
2
$0
$822
0
$0
$0
0
$0
$0
0
FY2014
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$65
0
$0
$0
2
$0
$502
0
$0
$0
0
$0
$0
0
FY2015 BalanceToComplete
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
$0
$0
$48
$111
0
0
$0
$0
$0
$0
2
1
$0
$0
$503
$938
0
0
$0
$0
$0
$0
0
0
$0
$0
$0
$0
0
0
Exhibit ENV-30B Summary by Phase
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
FUNDING BY WORK PHASE
ENV30 Part 2
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Environmental Restoration-IRP
Remedial Designs
Environmental Restoration-IRP
Remedial Designs
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Construction
Environmental Restoration-IRP
Remedial Action Operations
Environmental Restoration-IRP
Remedial Action Operations
Environmental Restoration-IRP
Remedial Action Operations
Environmental Restoration-IRP
Long Term Management
Environmental Restoration-IRP
Long Term Management
Environmental Restoration-IRP
Long Term Management
Environmental Restoration-IRP
Potentially Responsible Party
Environmental Restoration-IRP
Potentially Responsible Party
Environmental Restoration-IRP
Potentially Responsible Party
Environmental Restoration-Building Demolition/Debris ReN/A
Environmental Restoration-Building Demolition/Debris ReN/A
Environmental Restoration-Building Demolition/Debris ReN/A
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Environmental Restoration-Munitions Response
Assessments
Not Evaluated Relative Risk
Not Evaluated Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
High Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Medium Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Low Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
Not Evaluated Relative Risk
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
MRSPP 2
MRSPP 2
MRSPP 2
MRSPP 3
MRSPP 3
MRSPP 3
MRSPP 4
MRSPP 4
MRSPP 4
MRSPP 5
MRSPP 5
MRSPP 5
MRSPP 6
MRSPP 6
MRSPP 6
MRSPP 7
MRSPP 7
MRSPP 7
MRSPP 8
MRSPP 8
MRSPP 8
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
3
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
With Agreements
With Agreements
With Agreements
Without Agreements
Without Agreements
Without Agreements
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
$0
$0
4
$0
$5,819
2
$0
$0
35
$0
$59,289
92
$0
$19,514
42
$0
$13,273
66
$0
$11,172
0
$0
$0
0
$0
$218
505
$0
$132,086
419
$0
$21,440
0
$0
$250
2
$0
$0
4
$0
$0
3
$225
$0
2
$0
$0
6
$0
$0
7
$0
$0
3
$0
$0
10
$0
$0
285
$18,984
$0
3
$0
$0
15
$0
$0
$0
$0
4
$0
$4,983
0
$0
$5,626
59
$0
$60,248
91
$0
$22,616
70
$0
$16,026
75
$0
$3,893
0
$0
$2,516
0
$0
$0
514
$0
$127,578
427
$0
$18,583
0
$0
$0
3
$0
$615
0
$0
$0
2
$0
$0
2
$0
$0
6
$0
$0
7
$0
$0
3
$0
$0
9
$0
$0
304
$7,531
$0
0
$0
$0
14
$0
$0
$0
$0
7
$0
$856
0
$0
$0
63
$0
$41,674
82
$0
$20,977
83
$0
$37,656
78
$0
$1,024
0
$0
$1,587
0
$0
$2,355
527
$0
$148,956
487
$0
$28,098
0
$0
$0
3
$0
$7,507
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
104
$0
$0
0
$0
$0
1
$0
$0
$0
$0
6
$0
$2,046
1
$0
$2,196
58
$0
$51,858
60
$0
$18,289
80
$0
$73,733
69
$0
$5,171
1
$0
$5,489
0
$0
$325
584
$0
$131,041
491
$0
$26,793
0
$0
$0
2
$0
$2,609
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
$0
$0
2
$0
$0
0
$0
$0
8
$0
$863
27
$0
$0
31
$0
$11,992
41
$0
$909
0
$0
$1,935
5
$0
$0
612
$0
$163,614
492
$0
$40,025
0
$0
$0
2
$0
$2,772
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
567
$0
$169,663
498
$0
$37,857
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
549
$0
$106,448
478
$0
$17,027
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
515
$0
$112,928
457
$0
$20,789
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
477
$0
$988,688
671
$0
$348,847
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
Exhibit ENV-30B Summary by Phase
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
FUNDING BY WORK PHASE
ENV30 Part 2
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Analysis/Investigation
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Interim Actions
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Designs
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
Remedial Action Construction
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP 2
MRSPP 2
MRSPP 2
MRSPP 3
MRSPP 3
MRSPP 3
MRSPP 4
MRSPP 4
MRSPP 4
MRSPP 5
MRSPP 5
MRSPP 5
MRSPP 6
MRSPP 6
MRSPP 6
MRSPP 7
MRSPP 7
MRSPP 7
MRSPP 8
MRSPP 8
MRSPP 8
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP 3
MRSPP 3
MRSPP 3
MRSPP 4
MRSPP 4
MRSPP 4
MRSPP 6
MRSPP 6
MRSPP 6
MRSPP 8
MRSPP 8
MRSPP 8
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP 2
MRSPP 2
MRSPP 2
MRSPP 3
MRSPP 3
MRSPP 3
MRSPP 4
MRSPP 4
MRSPP 4
MRSPP 6
MRSPP 6
MRSPP 6
MRSPP 8
MRSPP 8
4
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
0
$0
$0
0
$0
$0
4
$0
$4,561
2
$0
$2,865
1
$0
$350
6
$0
$254
1
$0
$0
3
$0
$500
3
$0
$551
10
$0
$9,239
1
$0
$710
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$880
0
$0
0
$0
$0
13
$374
$0
4
$0
$0
3
$0
$2,715
1
$0
$0
6
$0
$0
3
$0
$1,066
3
$0
$0
3
$0
$0
16
$0
$21,459
1
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
0
$0
$0
14
$0
$0
0
$0
$0
2
$0
$0
0
$0
$0
0
$0
$0
2
$0
$0
0
$0
$0
0
$0
$0
7
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
3
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
0
$749
$0
4
$398
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
3
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
33
$0
$14,808
0
$0
$271
1
$0
$0
4
$0
$7,674
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
0
$0
$0
4
$159
$0
0
$0
$0
1
$0
$338
1
$0
$338
0
$0
$0
0
$0
$0
0
$0
$0
6
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
1
$0
$0
3
$0
$0
6
$0
$0
80
$0
$31,792
0
$0
$147
1
$0
$0
4
$0
$0
2
$0
$1,988
1
$0
$5,103
2
$0
$0
7
$0
0
$0
$0
3
$75
$0
0
$0
$0
1
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
6
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
121
$0
$26,504
0
$0
$0
1
$0
$0
0
$0
$0
1
$0
$2,311
1
$0
$5,359
2
$0
$0
6
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
92
$0
$596
0
$0
$0
0
$0
$0
0
$0
$0
2
$0
$408
1
$0
$0
3
$0
$583
6
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
9
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
2
$0
$0
1
$0
$0
3
$0
$0
6
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
Exhibit ENV-30B Summary by Phase
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
FUNDING BY WORK PHASE
ENV30 Part 2
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Environmental Restoration-Munitions Response
Remedial Action Operations
Remedial Action Operations
Remedial Action Operations
Remedial Action Operations
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
Long Term Management
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
No Further Action
MRSPP Evaluation Pending
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP 2
MRSPP 2
MRSPP 2
MRSPP 3
MRSPP 3
MRSPP 3
MRSPP 4
MRSPP 4
MRSPP 4
MRSPP 5
MRSPP 5
MRSPP 5
MRSPP 6
MRSPP 6
MRSPP 6
MRSPP 7
MRSPP 7
MRSPP 7
MRSPP 8
MRSPP 8
MRSPP 8
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP Evaluation Pending
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Known or Suspected Hazard
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
MRSPP No Longer Required
5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
Sites
Analysis
Clean-Up
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
0
0
0
0
0
116
0
0
0
0
0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
0
0
0
0
0
123
0
0
0
0
0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
5
$0
$130
2
$0
$23
3
$0
$46
2
$0
$46
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
5
$0
$0
2
$0
$0
3
$0
$0
2
0
0
9
0
0
123
0
0
0
0
0
$164
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
5
$0
$0
2
$0
$0
3
$0
$0
2
0
0
24
0
0
123
0
0
6
0
0
$0
0
$0
$0
0
$0
$476
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$85
6
$0
$143
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
5
$0
$0
2
$0
$0
3
$0
$0
2
0
0
33
0
0
123
0
0
6
0
0
$7,450
0
$0
$3,027
4
$0
$0
1
$0
$290
0
$0
$0
0
$0
$0
1
$0
$89
0
$0
$0
1
$0
$0
21
$0
$9,594
0
$0
$0
0
$0
$0
4
$0
$0
1
$0
$0
1
$0
$0
6
$0
$0
2
$0
$0
3
$0
$0
4
0
0
51
0
0
123
0
0
7
0
0
$18,116
0
$0
$2,849
0
$0
$0
0
$0
$0
0
$0
$0
0
$0
$0
1
$0
$0
0
$0
$0
0
$0
$0
36
$0
$5,525
0
$0
$86
1
$0
$86
4
$0
$0
1
$0
$0
1
$0
$0
6
$0
$0
3
$0
$0
3
$0
$0
4
0
0
108
0
0
123
0
0
15
0
0
$68,231
0
$0
$4,365
0
$0
$0
1
$0
$0
1
$0
$0
0
$0
$0
3
$0
$87
0
$0
$0
6
$0
$0
32
$0
$18,146
0
$0
$0
1
$0
$0
4
$0
$0
1
$0
$0
1
$0
$0
6
$0
$0
3
$0
$0
3
$0
$0
4
0
0
159
0
0
123
0
0
16
0
0
$337,989
0
$0
$4,638
0
$0
$0
2
$0
$445
2
$0
$66
1
$0
$40
3
$0
$48
0
$0
$0
6
$0
$0
161
$0
$39,783
0
$0
$260
0
$0
$25
0
$0
$0
2
$0
$0
1
$0
$0
0
$0
$0
4
$0
$0
0
$0
$0
6
0
0
182
0
0
0
0
0
2
0
0
Exhibit ENV-30B Summary by Phase
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ENVIRONMENTAL RESTORATION PROGRAM
OUTYEAR FUNDING BY PRIORITIES
Class
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Active
Active
Active
Active
Active
FUDS
No
No
No
No
No
No
No
No
No
FundSource
DERA
DERA
DERA
DERA
DERA
DERA
DERA
DERA
DERA
SitesInstallations
Total Number of DERA IRP Sites
Total Number of DERA IRP Sites
Total Number of DERA IRP Sites
Number of DERA IRP Sites Cleaned Up
Number of DERA IRP Sites Cleaned Up
Number of DERA IRP Sites Cleaned Up
Total Number of DERA MR Sites
Number of DERA MR Sites with Phase Completion
Number of DERA MR Sites with Phase Completion
RelativeRiskLevelIRPPhaseMR
High Relative Risk
Medium Relative Risk
Low Relative Risk
High Relative Risk
Medium Relative Risk
Low Relative Risk
N/A
Preliminary Assessment
Site Inspection
6
SitesPriorTo2008 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
1132
1
0
0
0
0
0
657
2
0
0
0
0
0
1808
0
0
0
0
0
0
1109
15
0
2
5
2
0
294
64
54
88
116
43
0
1242
109
61
111
163
122
0
485
32
0
0
0
0
0
450
0
14
14
2
4
1
132
13
243
107
2
2
0
FY2014
0
0
0
0
0
0
0
7
8
FY2015
0
0
0
0
0
0
0
1
0
Exhibit ENV-30C Outyear Funding by Priorities
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
DEPOT MAINTENANCE PROGRAM
OP-30
Depot Maintenance Program
This exhibit will be submitted electronically via SNaP
and available upon request
7
Exhibit OP-30 Depot Maintenance Program
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SPARES AND REPAIR PARTS
(Dollars in Millions)
FY 2008
Depot Level Reparables
Airframes
Aircraft Engines
Other
Missiles
Communications Equipment
Space
Support Equipment
Combat Support
Base Support
Air Operations
Servicewide Support
Airlift Operations
Real Property Maintenance
Training
Total
Consumables
Airframes
Aircraft Engines
Other
Missiles
Communications Equipment
Other Misc.
Total
FY 2009
FY 2010
FY 2009 - FY 2010
Change
Qty
($ in M)
Qty
($ in M)
Qty
($ in M)
Qty
($ in M)
N/A
N/A
$2,823
N/A
N/A
N/A
$2,142
N/A
N/A
N/A
$2,149
N/A
N/A
N/A
$7
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$15
N/A
$13
N/A
$21
$5
$27
$7
$0
$0
$4
$2,916
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$43
$28
$14
$10
$16
$10
$26
$4
$3
$1
$4
$2,301
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$32
$22
$13
$9
$16
$8
$23
$3
$3
$1
$4
$2,283
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$-11
$-6
$-1
$-1
$0
$-2
$-3
$-1
$0
$0
$0
$-18
N/A
N/A
$439
N/A
N/A
N/A
$420
N/A
N/A
N/A
$403
N/A
N/A
N/A
$-17
N/A
N/A
N/A
N/A
N/A
N/A
$518
$957
N/A
N/A
N/A
N/A
N/A
$464
$884
N/A
N/A
N/A
N/A
N/A
$438
$841
N/A
N/A
N/A
N/A
N/A
$-26
$-43
The FY 2010 Flying Hour Program reflects the latest (CY 2008) Air Force Cost Analysis Improvement Group approved cost factors. The FY 2010 consumption estimates
include the combined effects of the Overseas Contingency Operations Supplemental and peacetime training and reflects the impact of a decrease in the number of flying hours
for selected weapon systems. The depot level reparable (DLR) factor is based on the Spares Requirements Review Board (SRRB) recommendation. The SRRB methodology
estimates the number and type of spare parts that a weapon system requires. The FY 2010 average price change for DLRs is .92% which drives a slight increase in FY 2010.
8
Exhibit OP-31 Spares and Repair Parts
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SPARES AND REPAIR PARTS
(Dollars in Millions)
The primary driver for the decrease in DLRs is the overall reduction in primary authorized aircraft with significant changes in F-15s, F-16s, and A-10s. The FY 2010 average
price change for consumables is -1.54%.
9
Exhibit OP-31 Spares and Repair Parts
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
APPROPRIATED FUND SUPPORT FOR MWR ACTIVITIES
Class
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Reserve
Active
Active
Active
Active
Active
Active
Reserve
Active
Reserve
Active
Active
Reserve
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Reserve
Active
Active
Active
Active
Active
Active
Active
Active
Active
Reserve
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Reserve
Active
Active
Active
Active
Reserve
Active
Active
Active
Reserve
Active
Program
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Child Development and Youth Programs
Child Development and Youth Programs
Child Development and Youth Programs
Child Development and Youth Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Armed Services Exchange
Armed Services Exchange
Lodging Program
Lodging Program
Lodging Program
Lodging Program
Lodging Program
Lodging Program
Military MWR Programs
Category
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
Child Development Program (MWR Category B)
Child Development Program (MWR Category B)
Child Development Program (MWR Category B)
Child Development Program (MWR Category B)
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
Armed Service Exchange - N/A
Armed Service Exchange - N/A
PCS Lodging (Not MWR Category C)
PCS Lodging (Not MWR Category C)
TDY Lodging
TDY Lodging
TDY Lodging
TDY Lodging
A--Mission Sustaining Programs
FundSource
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Program Operation
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. A - Indirect Support
Child Development - Direct Program Operation
Child Development - Direct Program Operation
Child Development - GWOT Supplemental 08
Child Development - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Program Operation
Cat. B - Direct Overhead
Cat. B - Direct Overhead
Cat. B - Direct Overhead
Cat. B - Indirect Support
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Program Operation
Cat. C - Direct Overhead
Cat. C - Direct Overhead
Cat. C - Direct Overhead
Cat. C - Indirect Support
Armed Service Exchange - Direct Program Operation
Armed Service Exchange - Direct Program Operation
PCS - Direct Program Operation
PCS - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
Cat. A - GWOT Supplemental 08
Activity
A.1 Armed Forces Professional Entertainment Overseas
A.3 Physical Fitness and Aquatic Training
A.3 Physical Fitness and Aquatic Training
A.3 Physical Fitness and Aquatic Training
A.3 Physical Fitness and Aquatic Training
A.4 Library Programs & Information Services (Recreation)
A.4 Library Programs & Information Services (Recreation)
A.4 Library Programs & Information Services (Recreation)
A.6 Basic Social Recreation (Center) Programs
A.6 Basic Social Recreation (Center) Programs
A.6 Basic Social Recreation (Center) Programs
A.6 Basic Social Recreation (Center) Programs
A.8 Sports and Athletics
A.8 Sports and Athletics
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
B.2.2 Recreation Information, Tickets, and Tours Services
B.2.3 Recreational Swimming
B.3.1 Directed Outdoor Recreation
B.3.1 Directed Outdoor Recreation
B.3.1 Directed Outdoor Recreation
B.3.1 Directed Outdoor Recreation
B.3.2 Outdoor Recreation Equipment Checkout
B.4.3 Arts and Crafts Skill Development
B.4.3 Arts and Crafts Skill Development
B.4.4 Automotive Crafts Skill Development
B.4.5 Bowling (12 lanes or less)
B.4.5 Bowling (12 lanes or less)
B.5 Sports (Above Intramural Level)
N/A
N/A
N/A
N/A
C.1.1 Military Open Mess (Clubs)
C.1.1 Military Open Mess (Clubs)
C.1.2 Restaurants, snack bars, & other food outlets
C.2.2 Recreational Lodging
C.3.1 Flying Program
C.3.3 Rod and Gun Program
C.3.5 Horseback Riding
C.4.1 Resale activities (i.e., audio, photo, recycling, car wash, etc.)
C.4.3 Bowling (Over 12 lanes)
C.4.3 Bowling (Over 12 lanes)
C.4.4 Golf
C.4.4 Golf
C.4.5 Boating (with resale or private boat berthing)
C.4.6 Equipment Rental (other than outdoor recreation equipment rental)
C.4.8 Other
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ResourceType
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
Funding
TreasuryCode FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015
3400
$9,051
$6,200
$6,092
$6,134
$6,268
$6,408
$0
$0
3300
$5,800 $19,000 $52,926 $16,900 $11,500 $61,864
$0
$0
3400
$49,162 $50,146 $51,148 $52,171 $53,215 $54,279 $55,365 $56,472
3500
$42,344 $43,568 $44,827 $46,123 $47,456 $48,827 $50,238 $51,690
3740
$1,625
$1,657
$1,690
$1,724
$1,758
$1,794
$1,830
$1,866
3300
$5,200
$0
$0
$0 $26,399
$8,900
$0
$0
3400
$26,634 $26,634 $27,710 $28,264 $28,830 $29,406 $29,994 $30,594
3500
$211
$217
$223
$229
$236
$243
$250
$257
3300
$7,000
$0
$0
$9,200
$0
$0
$0
$0
3400
$10,791 $11,007 $11,227 $11,452 $11,681 $11,915 $12,153 $12,396
3500
$704
$724
$745
$766
$788
$811
$835
$859
3740
$0
$0
$0
$0
$0
$0
$0
$0
3400
$2,106
$2,148
$2,191
$2,234
$2,279
$2,325
$2,371
$2,419
3740
$386
$394
$402
$410
$418
$426
$435
$444
3400
$50,685 $54,292 $55,378 $56,486 $57,615 $58,768 $59,943 $61,142
3500
$9,499
$9,774 $10,056 $10,347 $10,646 $10,954 $11,270 $11,596
3740
$1,467
$1,496
$1,526
$1,557
$1,588
$1,620
$1,652
$1,685
3400
$23,779 $24,254 $24,739 $25,234 $25,739 $26,254 $26,779 $27,314
3300
$59,454 $20,800 $15,700 $18,100 $33,700
$0
$0
$0
3400
$141,182 $141,606 $142,029 $142,461 $142,901 $143,350 $143,808 $144,276
3400
$9
$0
$0
$0
$0
$0
$0
$0
3500
$374
$385
$396
$408
$420
$432
$444
$457
3400
$1,124
$1,146
$1,169
$1,193
$1,217
$1,241
$1,266
$1,291
3400
$5,567
$5,678
$5,792
$5,908
$6,026
$6,147
$6,269
$6,395
3300
$0
$0
$0
$0
$0
$0
$0
$0
3400
$14,304 $14,590 $14,882 $15,180 $15,483 $15,793 $16,109 $16,431
3500
$153
$158
$162
$167
$172
$177
$182
$187
3740
$124
$126
$129
$131
$134
$136
$139
$142
3400
$113
$115
$118
$120
$122
$125
$127
$130
3400
$9,585
$9,777
$9,973 $10,172 $10,376 $10,583 $10,795 $11,011
3500
$200
$206
$212
$218
$224
$231
$237
$244
3400
$4,993
$5,093
$5,195
$5,298
$5,404
$5,512
$5,623
$5,735
3400
$3,252
$3,317
$3,383
$3,451
$3,520
$3,590
$3,662
$3,735
3500
$0
$0
$0
$0
$0
$0
$0
$0
3400
$1,980
$2,020
$2,060
$2,101
$2,144
$2,186
$2,230
$2,275
3400
$81,008 $85,226 $86,930 $88,669 $90,442 $92,251 $94,096 $95,978
3500
$14,911 $15,342 $15,786 $16,242 $16,711 $17,194 $17,691 $18,203
3740
$2,303
$2,349
$2,396
$2,444
$2,493
$2,543
$2,594
$2,645
3400
$37,327 $38,073 $38,835 $39,612 $40,404 $41,212 $42,036 $42,877
3400
$10,334 $10,541 $10,751 $10,966 $11,186 $11,409 $11,638 $11,870
3500
$467
$481
$495
$509
$524
$539
$554
$571
3400
$59
$60
$61
$62
$63
$65
$66
$67
3400
$410
$419
$427
$435
$444
$453
$462
$471
3400
$237
$242
$247
$251
$256
$262
$267
$272
3400
$1
$1
$1
$1
$1
$1
$1
$1
3400
$23
$24
$24
$25
$25
$26
$26
$27
3400
$53
$54
$55
$56
$57
$59
$60
$61
3400
$2,035
$2,076
$2,118
$2,160
$2,203
$2,247
$2,292
$2,338
3500
$45
$46
$48
$49
$50
$52
$53
$55
3400
$3,575
$3,646
$3,719
$3,794
$3,870
$3,947
$4,026
$4,107
3500
$20
$21
$21
$22
$22
$23
$24
$24
3400
$173
$176
$180
$183
$187
$190
$194
$198
3400
$526
$536
$547
$558
$569
$580
$592
$604
3400
$281
$287
$293
$299
$304
$311
$317
$323
3400
$7,248
$7,393
$7,541
$7,692
$7,846
$8,003
$8,163
$8,326
3500
$1,293
$1,331
$1,369
$1,409
$1,449
$1,491
$1,534
$1,579
3740
$200
$204
$208
$212
$216
$221
$225
$229
3400
$3,236
$3,301
$3,367
$3,435
$3,503
$3,573
$3,645
$3,718
3300
$0
$0
$0
$0
$0
$0
$0
$0
3400
$6,902
$7,050
$7,202
$7,360
$7,524
$7,693
$7,886
$8,067
3400
$3,612
$3,685
$3,758
$3,833
$3,910
$3,988
$4,068
$4,149
3740
$1,842
$1,878
$1,916
$1,954
$1,993
$2,033
$2,074
$2,115
3300
$0
$0
$0
$0
$0
$0
$0
$0
3400
$12,329 $12,576 $12,827 $13,084 $13,345 $13,612 $13,885 $14,162
3500
$32,070 $32,997 $33,950 $34,932 $35,941 $36,980 $38,048 $39,148
3740
$7,848
$7,852
$8,009
$8,328
$8,828
$9,540 $10,513 $11,812
3400
$2,543
$0
$0
$0
$0
$0
$0
$0
Exhibit OP-34
10
Appropriated Fund Support for MWR Activities
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
APPROPRIATED FUND SUPPORT FOR MWR ACTIVITIES
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Military MWR Programs
Off Duty and Voluntary Education
Off Duty and Voluntary Education
Warfighter and Family Support
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Military MWR Programs
Lodging Program
Lodging Program
Lodging Program
Lodging Program
Lodging Program
Child Development and Youth Programs
Child Development and Youth Programs
Child Development and Youth Programs
B--Community Support Programs
Other Voluntary Education Programs
Tuition Assistance
Family Support (Non-MWR)
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
A--Mission Sustaining Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
B--Community Support Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
C--Revenue-Generating Programs
TDY Lodging
TDY Lodging
TDY Lodging
TDY Lodging
TDY Lodging
Youth Program (MWR Category B)
Youth Program (MWR Category B)
Youth Program (MWR Category B)
Cat. B - GWOT Supplemental 08
Other Ed Pgms - Direct Program Operation
Tuition Asst - Direct Program Operation
Family Support - Direct Program Operation
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. A - Direct Overhead
Cat. B - Direct Overhead
Cat. B - Direct Overhead
Cat. B - Direct Overhead
Cat. B - Direct Overhead
Cat. C - Direct Overhead
Cat. C - Direct Overhead
Cat. C - Direct Overhead
TDY - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
TDY - Direct Program Operation
YouthProgram - Direct Program Operation
YouthProgram - Direct Program Operation
YouthProgram - Direct Program Operation
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Funding
Funding
Funding
Funding
Civilian Direct FTE
Civilian Foreign Direct FTE
Civilian Foreign Indirect FTE
Enlisted
Officer
Civilian Direct FTE
Civilian Foreign Direct FTE
Civilian Foreign Indirect FTE
Enlisted
Civilian Direct FTE
Civilian Foreign Direct FTE
Civilian Foreign Indirect FTE
Civilian Direct FTE
Civilian Foreign Direct FTE
Civilian Foreign Indirect FTE
Enlisted
Officer
Funding
Funding
Funding
3400
3400
3400
3400
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3300
3400
3500
$2,547
$0
$0
$0
$0
$0
$0
$0
$14,141 $14,847 $15,847 $16,847 $17,847 $18,847 $19,847 $19,847
$180,665 $198,731 $212,643 $227,528 $243,455 $260,496 $260,496 $260,496
$58,541 $65,411 $77,900 $79,600 $80,800 $83,600 $85,800 $88,000
1624
1624
1624
1624
1624
1624
1624
1624
211
211
211
211
211
211
211
211
8
8
8
8
8
8
8
8
661
661
661
661
661
661
661
661
117
117
117
117
117
117
117
117
2476
2476
2476
2476
2476
2476
2476
2476
70
70
70
70
70
70
70
70
1
1
1
1
1
1
1
1
12
12
12
12
12
12
12
12
101
101
101
101
101
101
101
101
321
321
321
321
321
321
321
321
13
13
13
13
13
13
13
13
2
2
2
2
2
2
2
2
228
228
228
228
228
228
228
228
13
13
13
13
13
13
13
13
446
446
446
446
446
446
446
446
5
5
5
5
5
5
5
5
$0
$0 $12,200
$0
$0
$0
$0
$0
$27,159 $27,702 $28,256 $28,821 $29,398 $29,986 $30,586 $31,197
$170
$174
$179
$185
$190
$195
$201
$207
Exhibit OP-34
11
Appropriated Fund Support for MWR Activities
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
ADVISORY AND ASSISTANCE SERVICES
ADVISORY AND ASSISTANCE SERVICES
AIR FORCE
FY 10 PB
SUMMARY (Consolidated AF)
FY08
1. Management and Professional Support Services
FFRDC Work
Non-FFRDC Work
Subtotal
( Dollars in Thousands )
FY09
FY10
FY11
$5,277
$1,034,717
$1,039,993
$10,886
$1,038,213
$1,049,100
$9,096
$833,975
$843,071
$9,367
$797,112
$806,479
2. Studies, Analyses, and Evaluations
FFRDC Work
Non-FFRDC Work
Subtotal
$61,882
$143,504
$205,386
$64,399
$129,301
$193,700
$66,458
$112,701
$179,159
$68,514
$110,466
$178,980
3. Engineering & Technical Services
FFRDC Work
Non-FFRDC Work
Subtotal
$53,676
$297,404
$351,079
$55,872
$284,074
$339,946
$59,822
$238,477
$298,299
$62,965
$229,367
$292,333
$120,835
$1,475,624
$1,596,459
$55,218
$1,651,677
$131,157
$1,451,588
$1,582,746
$44,950
$1,627,696
$135,376
$1,185,153
$1,320,529
$51,954
$1,372,482
$140,846
$1,136,946
$1,277,792
$48,134
$1,325,926
Total
FFRDC Work
Non-FFRDC Work
Total Direct
Total Reimbursable
Grand Total
The data presented above is reported in accordance with the A&AS definitions and exemptions set forth
in section 1105(g)(2)(A) of Title 31, U.S.C. and section 911 of the FY 1999 Defense Authorization Act,
10 U.S.C. 2212.
POCs: Mr. Michael Kratz, SAF/AQXD, 588-7121
Lt Col Pat Rose SAF/FMBIP, 614-4642
12
Exhibit PB-15 Advisory and Assistance Services
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
MAJOR DEPARTMENT OF DEFENSE HEADQUARTERS ACTIVITIES
FY 2008 MHA
DoD Component
Department of the Air Force
AFRICOM
CENTCOM
EUCOM
JFCOM
NORTHCOM
PACOM
SOUTHCOM
STRATCOM
TRANSCOM
Total Air Force
Type
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
Military
Civilian
(A)
(B)
(C)
(D)
(E)
Begin
End
Increases for:
Cost savings
strength
strength Contract replacement Other reasons
7,416
7,313
5,817
5,923
0
71
0
0
147
154
8
11
199
227
0
0
29
56
0
0
101
102
287
277
229
223
0
0
44
34
0
0
297
288
322
363
85
88
306
249
8,547
8,556
0
9
0
6,740
6,823
0
83
0
(A) MHA as of the end of FY07 (30 September 2007)
(B) MHA as of the end of FY08 (30 September 2008)
Note: The above numbers do not include US Special Operations Command and Air Force Special Operations
Command.
Other Reasons: Net increase result of establishing AF Cyber Numbered Air Force (NAF) and US Africa Command.
Realignment from existing Air Force MHQ resulted in a net of 3 overall increase for AF Cyber Command. There was
some additional operational growth at the US Combatant Commands above the growth for US Africa Command. The
remainder difference can be attributed to the conversion of vacant military positions to civilian performance which
resulted in higher fill rates at MHQs.
Exhibit PB-22
13
Major Deptartment of Defense Headquarters Activities
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR COMMAND and STAFF COLLEGE (ACSC)
I. Narrative Description: The mission of the Air Command and Staff College (ACSC) is to prepare field-grade officers to develop, employ, and command air, space, and cyberspace power
in joint, combined and multinational operations. ACSC, the Air Force’s intermediate Professional Military Education (PME) institution, prepares field grade officers of all services (primarily
O-4s and O-4 selects), international officers, and US civilians to assume positions of higher responsibility within the military and other government arenas. Geared toward teaching the skills
necessary to conduct air and space operations in support of a joint campaign, ACSC focuses on shaping and molding tomorrow’s leaders and commanders.
II. Description of Operations Financed: ACSC conducts one 10-month in-residence class per year, which starts in one FY and graduates in the next FY. The class consists of
approximately 509 officers including USAF, Guard, Reserve, Army, Navy, and Marines with 80 international officers and civilian employees of selected federal agencies. All graduates
receive Joint Professional Military Education Phase 1 credit. Both correspondence and seminar programs are also conducted with over 10,000 students worldwide. Topics include national
security, warfare studies, leadership, command, joint planning, joint air operations, regional and cultural studies, joint forces as well as emerging military issues. In-residence US military
and selected international graduates earn a Master of Military Operational Art and Science degree; a distance learning master’s degree program was also initiated in FY07.
III. Financial Summary ($ Thousands):
A. Air Command and Staff College
FY 2009
FY 2008
Actuals
Budget
Request Appropriated Current
FY 2010
Estimate
FY 2009/10
Change
Mission (O&M-Excl Civ Pay)
7,276
6,249
6,570
6,570
7,036
466
Base Operations
Military Personnel
O&M
8,035
2,527
5,508
8,805
2,782
6,023
8,344
2,641
5,703
8,344
2,641
5,703
8,960
2,858
6,102
616
217
399
School Personnel
Military Personnel
Civilian
21,217
16,271
4,946
28,031
22,406
5,625
27,830
22,537
5,293
27,830
22,537
5,293
28,723
23,301
6,157
1,628
764
864
Total Direct Cost
Total Reimbursable Cost
Total Direct & Reimbursable Cost
36,528
0
36,528
43,085
0
43,085
42,744
0
42,744
42,744
0
42,744
45,454
0
45,454
2,710
0
2,710
Notes: Mission O&M: Overall changes between FY09/FY10; FY09 through FY10 include baseline of $4.3M, $4.8M, and $6.3M, respectively, for Chief of Staff approved Distance Learning
(DL) Masters Program. FY10 National Defense Authorization Act 343 converted contract to civilian dollars – $1.1M, taken from DL Masters Program.
School Personnel: Civilian pay computed using actual work-year costs. Base Operations: Dollars comprised of costs from other Program Element Codes, not 84751F.
14
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR COMMAND and STAFF COLLEGE (ACSC)
IV.
Performance Criteria and Evaluation:
FY 2008
Actuals
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
Direct Funded:
Student Input
Student Load
Graduates
398
320
410
429
327
398
429
340
429
0
13
31
Reimbursable Funded:
Student Input
Student Load
Graduates
77
60
74
80
62
77
80
63
80
0
1
3
Average Cost Per Student Load
$96
$110
$113
$3
Notes:
1. Direct funded input numbers are fiscal year entries and graduates.
2. Reimbursable funded numbers are non-US.
3. Load is calculated using Training Days equaling 250 days annually.
4. FY10 estimated based on FY10 PRD.
15
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR COMMAND and STAFF COLLEGE (ACSC)
V. Personnel Summary: (Excludes students):
FY2008
Estimate
FY 2009
Estimate
FY 2010
Estimate
Military End Strength (Total)
Authorized
Officers
Enlisted
145
134
11
143
133
10
143
133
10
Military Workyears ($000) (Total)
Officer
Enlisted
110
97
13
143
133
10
143
133
10
Civilian End Strength (Total)
Authorized
USDH
60
60
59
67
Civilian FTEs ($000) (Total)
USDH
53
53
59
59
67
67
FY 2009/10
Change
0
0
0
0
0
0
0
0
0
0
16
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE INSTITUE OF TECHNOLOGY (AFIT)
I. Narrative Description: The mission of Air Force Institute of Technology (AFIT) is to provide responsive, defense-focused graduate and continuing education, research, and consultation
to improve Air Force and joint operational capability. AFIT supports the Air Force and national defense by providing degree granting graduate and professional continuing education (PCE),
research, and consulting services that are responsive to Air Force and DoD needs and requirements. Graduate-level work, available to selected officers, noncommissioned officers, DOD
and non-DOD civilians, and international officers, produces experts in engineering, scientific, and managerial disciplines needed to develop solutions to complex national defense problems
and develops individuals with a broader perspective necessary for understanding the role of technology in national defense. PCE courses support Air Force and DOD needs for immediate
applicable knowledge and help prevent scientific and technical obsolescence. Allocations are tied to specific billets that are validated and coded by MAJCOM manpower staffs. AFIT
manages students enrolled in the Graduate School of Engineering and Management, School of Systems and Logistics, the Civil Engineer and Services School at AFIT, Naval Post
Graduate School, and students who attend programs offered through civilian institutions (CI).
II. Description of Operations Financed: This program provides for the faculty, academic support staff, computer resources and library facilities required to maintain an accredited graduate
university. AFIT provides acquisitions, logistics, civil engineering, environmental and services courses that supply special and advanced knowledge of immediate applicability.
III. Financial Summary ($ Thousands):
A. AF Institute of Technology
FY 2008
Estimate
FY 2009
Budget
Request Appropriated Current
FY 2010
Estimate
FY 2009/10
Change
Mission (O&M-Excl Civ Pay)
34,500
20,073
20,021
20,021
25,329
5,308
Base Operations
Military Personnel
O&M
26,142
8,225
17,917
16,839
5,322
11,517
28,841
9,133
19,708
28,841
9,133
19,708
30,438
9,713
20,725
1,597
580
1,017
School Personnel
Military Personnel
Civilian
48,305
22,749
25,556
54,314
29,131
25,183
56,144
28,960
27,184
56,144
28,960
27,184
57,786
29,942
27,844
1,642
982
660
108,947
12,293
121,240
91,226
10,376
101,602
105,006
12,539
117,545
105,006
12,539
117,545
113,553
12,785
126,338
8,547
246
8,793
Total Direct Cost
Total Reimbursable Cost
Total Direct & Reimbursable Cost
Notes: Mission O&M: Overall changes between FY09/FY10 fully funded Student TDY-to-School (TTS) programs; FY10 includes restoration funding.
17
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE INSTITUE OF TECHNOLOGY (AFIT)
IV.
Performance Criteria and Evaluation:
FY 2008
Actuals
FY 2009
Estimate
3,052
1,244
3,129
2,806
1,343
3,020
3,318
1,402
3,325
512
59
305
Reimbursable Funded:
Student Input
Student Load
Graduates
99
91
116
112
96
119
105
80
94
-7
-16
-25
Average Cost Per Student Load
$91
$82
$85
$3
Direct Funded:
Student Input
Student Load
Graduates
FY 2010
Estimate
FY 2009/10
Change
Notes:
1. Direct funded input numbers are fiscal year entries and graduates less non-US for all courses and less Sister Service personnel for Graduate Education Programs.
2. Reimbursable funded numbers are Non-US for all courses and Sister Service personnel for Graduate Education Programs.
3. Load is calculated using Training Days equaling 250 days annually.
4. Graduate Education data does not include medical programs; PCE is AETC sponsored courses only.
5. "Input" is students who enrolled during the displayed FY and do not include carryovers; "Output" are students completing the program that FY.
6. FY09-10 numbers are based on FY09 & FY10 Professional Continuing Education (PCE) Program Guidance Letter (PGL) plus historical estimates for non Air Force students.
7. FY09-10 numbers are based on FY 09 & FY10 Advanced Academic Degree projections, PGL plus historical estimates for Non-US students.
18
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE INSTITUE OF TECHNOLOGY (AFIT)
V. Personnel Summary: (Excludes students):
FY2008
Actuals
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
Military End Strength (Total)
Authorized
Officers
Enlisted
223
174
49
214
169
45
214
169
45
0
0
0
Military Workyears ($000) (Total)
Officer
Enlisted
181
131
50
214
169
45
214
169
45
0
0
0
Civilian End Strength (Total)
Authorized
USDH
307
307
307
0
Civilian FTEs ($000) (Total)
USDH
277
303
303
0
19
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR WAR COLLEGE (AWC)
I. Narrative Description: The mission of the Air War College (AWC) is to develop and support senior leaders through education, research, and information programs focused on strategic
and institutional leadership, joint and multinational war fighting, multi-agency international security operations, air, space and cyberspace force development, and national security planning.
Air War College develops the knowledge, skills, and attitudes in its students that are significant to the profession of arms with emphasis on air, space, and cyberspace power and its
application in joint and multinational warfighting.
II. Description of Operations Financed: AWC has one 10-month in-residence class per year, which starts in one FY and graduates in the next FY. The class starting in FY09, includes
approximately 240 officers, including 45 international officers and civilian employees of selected federal agencies. Correspondence and non-residence seminar programs are also offered.
The National Security Forum is hosted by the Secretary of the Air Force and brings together approximately 140 civilian leaders with diverse backgrounds to focus on national security
issues. This Forum serves to broaden and solidify the participants’ understanding of airpower and national security issues. The regional studies program teaches each in-residence class
member the political, military, economic and cultural environment of a specific world region in which the U.S. has security interests, and U.S. forces could be called upon to conduct joint or
combined military operations. Class members prepare a security issues paper and participate in a 12-day traveling seminar where they meet U.S. and foreign military and civilian leaders.
In-residence graduates earn a Masters of Strategic Studies degree.
III. Financial Summary ($ Thousands):
A. Air War College
FY 2009
FY 2008
Actuals
Budget
Request
Appropriated Current
FY 2010
Estimate
FY 2009/10
Change
Mission (O&M-Excl Civ Pay)
6,516
10,315
4,630
4,630
4,808
178
Base Operations
Military Personnel
O&M
5,418
1,704
3,714
5,649
1,785
3,864
5,616
1,777
3,839
5,616
1,777
3,839
5,557
1,772
3,785
-59
-5
-54
School Personnel
Military Personnel
Civilian
13,621
9,133
4,488
14,545
9,295
5,250
13,656
9,080
4,576
13,656
9,080
4,576
14,075
9,388
4,687
419
308
111
Total Direct Cost
Total Reimbursable Cost
Total Direct & Reimbursable Cost
25,555
50
25,605
30,509
131
30,640
23,902
50
23,952
23,902
50
23,902
24,440
50
24,490
538
0
588
Notes:
Mission O&M: FY 09-10 change includes $178K for restoration of funding for the TDY-to-School.
School Personnel: Civilian pay computed using actual workyear costs.
20
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR WAR COLLEGE (AWC)
IV. Performance Criteria and Evaluation:
FY 2008
Actual
Direct Funded:
Student Input
Student Load
Graduates
Reimbursable Funded:
Student Input
Student Load
Graduates
Average Cost Per Student Load
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
209
173
204
195
169
209
200
165
195
5
-4
-14
45
36
42
45
38
45
45
38
45
0
0
0
$123
$116
$121
$5
Notes:
1. Direct funded input numbers are fiscal year entries and graduates, less Non-US.
2. Reimbursable funded numbers are Non-US.
3. Load is calculated using 250 training days.
4. FY10 Estimate based on FY10 Program Requirement Document (PRD) received 31 Dec 08.
21
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR WAR COLLEGE (AWC)
V. Personnel Summary: (Excludes students):
FY 2008
Actual
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
Military End Strength (Total)
Authorized
Officers
Enlisted
63
46
17
57
44
13
57
44
13
0
0
0
Military Workyears ($000) (Total)
Officer
Enlisted
62
44
18
57
44
13
57
44
13
0
0
0
Civilian End Strength (Total)
Authorized
USDH
49
49
51
51
51
51
0
0
Civilian FTEs ($000) (Total)
USDH
49
49
51
51
51
51
0
0
22
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE SENIOR NONCOMMISSIONED OFFICER ACADEMY (SNCOA)
I. Narrative Description: The mission of the Air Force Senior Non-Commissioned Officer Academy (AFSNCOA) is to prepare senior Non-Commissioned Officers to lead the enlisted force
in the employment of air, space, and cyberspace power in support of our national security objectives. The AFSNCOA is the capstone of enlisted professional military education. Active
duty Air Force personnel must complete this course before they can be promoted to chief master sergeant.
II. Description of Operations Financed: The AFSNCOA program has five resident classes each year. The Academy’s yearly enrollment of senior NCOs, chief petty officers and
international senior NCOs receive instruction in four major categories: profession of arms, communication skills, leadership and management, and collateral studies. The AFSNCOA
synchronizes course dates with the Air and Space Basic Course and features one-week combined classes with the flights restructured to mix lieutenants and senior NCOs together with the
goal of increased understanding and appreciation of the talents officers and enlisted members bring to the fight.
III.
Financial Summary ($ Thousands):
A. Senior Noncommissioned Officer Academy
FY 2008
Actuals
FY 2009
Budget
Request Appropriated Current
FY 2010
Estimate
FY 2009/10
Change
Mission (O&M-Excl Civ Pay)
5,466
5,216
5,722
5,722
8,033
2,311
Base Operations
Military Personnel
O&M
4,030
1,268
2,762
4,500
1,422
3,078
5,424
1,717
3,707
5,424
1,717
3,707
6,231
1,988
4,243
807
271
536
School Personnel
Military Personnel
Civilian
4,076
3,710
366
6,125
5,633
492
6,012
5,563
449
6,012
5,563
449
6,211
5,752
459
199
189
10
13,572
0
13,572
15,841
17,158
17,158
20,475
3,317
15,841
17,158
17,158
20,475
3,317
Total Direct Cost
Total Reimbursable Cost
Total Direct & Reimbursable Cost
Note: Mission O&M: Overall changes between FY09/FY10 has a Student TDY-to-School (TTS) unfunded of $514K; FY10 includes restoration funding for TTS $2.3M per out year. School
Personnel: Civilian pay computed using actual work-year costs. Base Operations: Dollar comprised of costs from other Program Element Codes, not 84751F.
23
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE SENIOR NONCOMMISSIONED OFFICER ACADEMY (SNCOA)
IV.
Performance Criteria and Evaluation:
FY 2008
Actuals
Direct Funded:
Student Input
Student Load
Graduates
Reimbursable Funded:
Student Input
Student Load
Graduates
Average Cost Per Student Load
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
1,538
202
1,527
1,994
263
1,994
2,236
295
2,236
242
32
242
13
2
13
30
4
30
30
4
30
0
0
0
$67
$64
$68
$4
Notes:
1. Direct funded input numbers are fiscal year entries and graduates, minus Non-US.
2. Reimbursable funded numbers are non-US.
3. Load is calculated using Training Days 250 days annually.
4. FY 10 estimates based on FY10 Program Requirements Document (PRD)
V. Personnel Summary: (Excludes students):
24
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
AIR FORCE SENIOR NONCOMMISSIONED OFFICER ACADEMY (SNCOA)
FY CY
Budget
Request
Military End Strength (Total)
Authorized
Officers
Enlisted
Appn
FY2008
Actuals
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
58
58
58
0
58
58
58
0
40
58
58
0
40
58
58
0
Civilian End Strength (Total)
Authorized
USDH
5
5
5
0
Civilian FTEs ($000) (Total)
USDH
4
5
5
0
Military Workyears ($000) (Total)
Officer
Enlisted
25
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
SQUADRON OFFICER COLLEGE (SOC)
I. Narrative Description: The mission of the Squadron Officer College (SOC) is to develop 21st century Airmen who can advocate what air, space, and cyberspace power bring to the fight,
value team achievement over individual success, and value their vital role in the profession of arms.
II. Description of Operations Financed: SOC is composed of two educational schools: the Air and Space Basic Course (ASBC) and Squadron Officer School (SOS). ASBC is the starting
point for all officer Professional Military Education, with ten 6-week courses per year. ASBC’s curriculum explores the foundations of air, space, and cyberspace doctrine, and examines
how air, space, and cyberspace power is employed in combat. ASBC synchronizes course dates with the Senior Non-Commissioned Officer Academy (SNCOA) and features a week of
combined classes with the flights restructured to mix lieutenants and senior NCOs together with the goal of increasing understanding and appreciation of the talents officers and enlisted
members bring to the fight. SOS is designed to teach company grade officers the skills of command leadership, with seven 5-week courses per year. While attending SOS, students step
away from their special technical skills and broaden their focus on the Air Force as an institutional fighting force. They prepare for leadership responsibilities, study the significance of the Air
Force Core Values and learn about air, space, and cyberspace doctrine. After studying various leadership concepts, they are required to apply these lessons in various learning exercises.
III. Financial Summary ($ Thousands):
A. Squadron Officer College
FY 2008
Actuals
FY 2009
Budget
Request Appropriated Current
FY 2010
Estimate
FY 2009/10
Change
Mission (O&M-Excl Civ Pay)
20,814
20,754
20,652
20,652
25,840
5,188
Base Operations
Military Personnel
O&M
13,483
3,675
9,808
12,980
4,100
8,880
14,197
4,229
9,968
14,197
4,229
9,968
15,531
4,476
11,055
1,334
247
1,087
School Personnel
Military Personnel
Civilian
23,785
20,945
2,840
30,203
27,660
2,543
32,775
29,366
3,409
32,775
29,366
3,409
33,853
30,361
3,492
1,078
995
83
Total Direct Cost
Total Reimbursable Cost
Total Direct & Reimbursable Cost
58,082
0
58,082
63,937
0
63,937
67,624
0
67,624
67,624
0
67,624
75,224
0
75,224
7,600
0
7,600
Notes:
Mission O&M: FY09 to FY10 change includes retooled ASBC program increases of $188K, and restoration of TDY-to-School (TTS) funding of $5M.
School Personnel: Civilian pay computed using actual workyear costs.
Base Operations: FY09 to FY10 change includes $1.3M for retooled ASBC program
26
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
SQUADRON OFFICER COLLEGE (SOC)
IV. Performance Criteria and Evaluation:
FY 2008
Actual
Direct Funded:
Student Input
5,890
Student Load
634
Graduates
5,859
Reimbursable Funded:
Student Input
Student Load
Graduates
Average Cost Per Student Load
1.
2.
3.
4.
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
6,518
704
6,518
6,673
721
6,673
155
17
155
70
8
69
96
10
96
96
10
96
0
0
0
$90
$95
$103
$8
Notes:
Direct funded input numbers are fiscal year entries and graduates.
Reimbursable funded numbers are non-US students.
Load is calculated using 250 training days.
FY10 Estimates based on FY10 Program Requirements Documents received 31 Dec 08.
Note from the FMR: Average Cost per Student Load (Total Direct and Reimbursable from Part III divided by the total direct and reimbursable student load)
Include student input, load, and graduates for resident course only.
27
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
PROFESSIONAL MILITARY EDUCATION SCHOOLS
SQUADRON OFFICER COLLEGE (SOC)
V. Personnel Summary: (Excludes students):
FY2008
Actual
FY 2009
Estimate
FY 2010
Estimate
FY 2009/10
Change
Military End Strength (Total)
Authorized
Officers
Enlisted
216
202
14
234
201
33
234
201
33
0
0
0
Military Workyears (Total)
Officer
Enlisted
169
152
17
234
201
33
234
201
33
0
0
0
Civilian End Strength (Total)
Authorized
USDH
36
36
38
38
38
38
0
0
Civilian FTEs (Total)
USDH
31
31
38
38
38
38
0
0
28
Exhibit PB-24 Professional Military Education Schools
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
Class
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Location
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Foreign
Foreign
Foreign
Foreign
Foreign
Foreign
Foreign
EnvironmentalActivityCostType
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
EnvironmentalCosts
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
RCRA I-Underground Storage Tanks
Safe Drinking Water Act
Planning
Other Compliance Non-Recurring
Education & Training
Permits & Fees
Waste Disposal
Other Compliance Recurring
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Clean Air Act
Safe Drinking Water Act
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
RCRA I-Underground Storage Tanks
Safe Drinking Water Act
Planning
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
ProgramElement
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0101856F
0102856F
0102856F
0102856F
0102856F
0102856F
0102856F
0102856F
0102856F
0102856F
0102856F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
TreasuryCode
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
FY2008
FY2009
FY2010
FY2011
FY2012
FY2013
FY2014
FY2015
$1,714
$2,196
$2,246
$2,310
$2,354
$2,445
$2,511
$2,582
$39
$39
$40
$41
$42
$43
$43
$44
$44
$45
$46
$47
$48
$48
$49
$50
$30
$31
$32
$32
$33
$34
$34
$35
$44
$45
$46
$47
$48
$48
$49
$50
$109
$112
$114
$117
$119
$122
$125
$126
$1,742
$2,071
$257
$2,256
$2,522
$2,772
$2,379
$2,424
$97
$115
$14
$125
$140
$154
$132
$135
$1,936
$2,301
$286
$2,507
$2,802
$3,080
$2,644
$2,693
$0
$0
$0
$0
$0
$0
$0
$0
$387
$460
$57
$501
$560
$616
$529
$539
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$60
$61
$62
$63
$64
$66
$67
$69
$15
$15
$16
$16
$16
$16
$17
$17
$50
$51
$52
$53
$54
$55
$56
$57
$84
$86
$87
$88
$91
$92
$95
$97
$121
$559
$171
$174
$230
$179
$183
$185
$242
$1,118
$342
$348
$459
$358
$365
$371
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$145
$671
$205
$209
$275
$215
$219
$223
$0
$0
$0
$0
$0
$0
$0
$0
$16,078 $20,077 $20,238 $20,828 $21,236 $22,042 $22,649 $23,272
$1,304
$1,429
$1,384
$1,429
$1,469
$1,499
$1,529
$1,560
$5,238
$5,741
$5,559
$5,742
$5,904
$6,023
$6,144
$6,268
$3,490
$3,825
$3,704
$3,825
$3,934
$4,013
$4,093
$4,176
$2,551
$2,796
$2,707
$2,796
$2,875
$2,933
$2,992
$3,052
$10,964 $12,017 $11,637 $12,019 $12,359 $12,608 $12,861 $13,120
$1,887
$2,688
$1,115
$1,270
$1,400
$1,367
$1,308
$1,511
$5,458
$7,773
$3,223
$3,673
$4,047
$3,955
$3,783
$4,370
$2,334
$3,325
$1,379
$1,571
$1,731
$1,691
$1,618
$1,869
$2,026
$2,885
$1,197
$1,364
$1,502
$1,468
$1,404
$1,622
$791
$1,127
$467
$532
$587
$573
$548
$633
$7,268 $10,351
$4,293
$4,891
$5,390
$5,266
$5,038
$5,819
$6,750
$9,613
$3,986
$4,543
$5,006
$4,891
$4,679
$5,404
$678
$966
$401
$457
$503
$492
$470
$543
$5,167
$5,699
$5,875
$6,036
$6,150
$6,377
$6,546
$6,720
$703
$717
$731
$746
$761
$776
$792
$808
$1,968
$2,008
$2,048
$2,089
$2,131
$2,173
$2,217
$2,261
$1,284
$1,309
$1,336
$1,362
$1,390
$1,417
$1,446
$1,475
$0
$0
$0
$0
$0
$0
$0
$0
$4,578
$4,670
$4,763
$4,859
$4,956
$5,055
$5,156
$5,259
$342
$556
$532
$354
$319
$292
$283
$300
Exhibit PB-28
29
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Active
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Safe Drinking Water Act
Planning
RCRA I-Underground Storage Tanks
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Permits & Fees
Waste Disposal
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA I-Underground Storage Tanks
Safe Drinking Water Act
Planning
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Permits & Fees
Waste Disposal
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA I-Underground Storage Tanks
Safe Drinking Water Act
Planning
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA I-Underground Storage Tanks
Safe Drinking Water Act
Planning
Other Compliance Non-Recurring
Manpower
0305856F
0305856F
0305856F
0305856F
0305856F
0305856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0401856F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505256F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0505356F
0708056F
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3400 O&M,USAF
$2,220
$1,142
$736
$559
$122
$66
$9,762
$3
$9
$2
$8
$102
$0
$0
$0
$0
$0
$0
$0
$5,042
$886
$2,015
$599
$3,083
$4,992
$1,739
$1,828
$1,256
$317
$4
$3,105
$300
$5,098
$154
$338
$199
$46
$894
$50
$376
$290
$56
$0
$233
$2,717
$15,615
$1,652
$850
$548
$416
$91
$49
$11,488
$394
$1,107
$244
$970
$3,886
$391
$7,286
$1,505
$86
$194
$435
$4,257
$14,054
$780
$1,773
$527
$2,712
$4,391
$1,530
$1,608
$1,105
$279
$4
$2,732
$262
$5,435
$139
$306
$180
$42
$809
$45
$340
$262
$51
$0
$210
$2,460
$17,139
$2,212
$1,138
$734
$557
$122
$66
$14,160
$417
$1,189
$283
$1,040
$4,163
$972
$18,194
$3,967
$230
$552
$1,137
$5,374
$14,857
$748
$1,701
$505
$2,602
$4,213
$1,468
$1,543
$1,060
$267
$4
$2,621
$253
$5,864
$119
$260
$153
$35
$688
$38
$289
$223
$43
$0
$179
$2,091
$18,097
$2,238
$1,152
$742
$564
$123
$67
$14,183
$449
$1,305
$344
$1,141
$4,557
$1,016
$19,342
$4,932
$297
$812
$1,382
$5,531
$15,320
$758
$1,723
$512
$2,637
$4,269
$1,487
$1,564
$1,074
$271
$4
$2,656
$87
$5,994
$130
$285
$168
$39
$753
$42
$317
$244
$47
$0
$196
$2,287
$18,301
$2,280
$1,173
$756
$575
$126
$68
$14,450
$446
$1,286
$324
$1,125
$4,496
$1,051
$19,830
$4,685
$277
$715
$1,327
$5,664
$15,675
$770
$1,752
$520
$2,679
$4,339
$1,511
$1,589
$1,092
$275
$4
$2,699
$89
$6,140
$132
$289
$170
$39
$763
$43
$321
$247
$48
$0
$198
$2,319
$18,655
$2,312
$1,189
$767
$583
$127
$69
$14,931
$454
$1,308
$328
$1,144
$4,572
$1,033
$19,504
$4,615
$273
$706
$1,307
$5,696
$16,032
$826
$1,877
$558
$2,872
$4,650
$1,620
$1,703
$1,170
$295
$4
$2,893
$109
$6,302
$161
$354
$208
$48
$935
$52
$393
$303
$59
$0
$243
$2,843
$19,330
$2,362
$1,215
$784
$595
$130
$70
$15,328
$463
$1,334
$335
$1,167
$4,665
$1,058
$19,976
$4,725
$280
$722
$1,338
$5,817
$16,402
$797
$1,812
$538
$2,771
$4,488
$1,563
$1,643
$1,129
$285
$4
$2,791
$99
$6,461
$136
$297
$175
$41
$787
$44
$331
$255
$49
$0
$205
$2,390
$19,850
$2,404
$1,237
$797
$606
$132
$72
$15,734
$473
$1,363
$343
$1,192
$4,766
$1,103
$20,822
$4,920
$291
$751
$1,393
$5,980
$16,780
$812
$1,845
$548
$2,823
$4,571
$1,592
$1,674
$1,150
$290
$4
$2,844
$106
$6,623
$138
$303
$178
$41
$801
$45
$337
$260
$50
$0
$208
$2,433
$20,382
Exhibit PB-28
30
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Foreign
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Planning
Other Compliance Non-Recurring
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
Manpower
Education & Training
Sampling, Analysis & Monitoring
Waste Disposal
Permits & Fees
Other Compliance Recurring
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Compliance Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
Hazardous Material Reduction
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Pollution Prevention Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Pollution Prevention Non-Recurring
Manpower
0805756F
0805756F
0805756F
0805756F
0805756F
0805756F
0805756F
0805756F
0805756F
0805856F
0805856F
0805856F
0805856F
0805856F
0805856F
0805856F
0805856F
0805856F
0901256F
0901256F
0901256F
0901256F
0901256F
0901256F
0901256F
0901256F
0901256F
0901256F
0101854F
0101854F
0101854F
0101854F
0101854F
0101854F
0101854F
0101854F
0101854F
0208854F
0208854F
0208854F
0208854F
0208854F
0208854F
0208854F
0208854F
0208854F
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
$477
$266
$3,900
$71
$541
$37
$0
$197
$100
$171
$53
$87
$50
$9
$553
$0
$412
$10
$6,638
$139
$184
$18
$49
$706
$0
$0
$0
$11,635
$8
$5
$52
$182
$16
$0
$863
$0
$157
$2,652
$267
$6,608
$1,406
$2,900
$343
$519
$2,389
$317
$487
$271
$5,430
$2
$14
$1
$0
$5
$3
$337
$89
$145
$83
$15
$939
$0
$689
$17
$6,549
$142
$188
$18
$50
$720
$0
$0
$0
$5,133
$8
$5
$53
$159
$14
$0
$756
$0
$138
$3,300
$272
$7,075
$2,636
$4,864
$405
$447
$5,016
$728
$496
$276
$4,243
$504
$3,821
$259
$0
$1,393
$703
$182
$58
$94
$54
$10
$602
$0
$448
$11
$6,540
$145
$192
$19
$51
$734
$0
$0
$0
$5,625
$9
$5
$54
$265
$23
$0
$1,256
$0
$228
$3,192
$84
$1,956
$440
$923
$99
$153
$735
$247
$506
$282
$4,334
$497
$3,768
$255
$0
$1,373
$693
$193
$67
$109
$63
$12
$697
$0
$519
$13
$6,609
$148
$196
$19
$52
$749
$0
$0
$0
$6,040
$9
$5
$55
$269
$23
$0
$1,274
$0
$231
$3,280
$86
$1,990
$426
$896
$98
$152
$714
$255
$516
$288
$4,405
$467
$3,540
$240
$0
$1,290
$651
$194
$64
$104
$60
$11
$667
$0
$496
$12
$6,733
$151
$199
$19
$54
$764
$0
$0
$0
$6,007
$9
$6
$56
$274
$24
$0
$1,298
$0
$234
$3,344
$88
$2,030
$424
$895
$99
$153
$711
$259
$527
$293
$4,497
$519
$3,938
$267
$0
$1,435
$724
$225
$99
$160
$92
$17
$1,025
$0
$763
$18
$6,891
$154
$203
$20
$55
$779
$0
$0
$0
$5,955
$9
$6
$56
$277
$24
$0
$1,315
$0
$239
$3,474
$89
$2,073
$431
$908
$100
$155
$724
$270
$537
$299
$4,589
$459
$3,484
$236
$0
$1,270
$641
$204
$65
$105
$60
$11
$672
$0
$500
$12
$6,891
$157
$208
$20
$56
$795
$0
$0
$0
$6,267
$9
$6
$57
$283
$24
$0
$1,343
$0
$245
$3,572
$91
$2,115
$1,164
$2,204
$198
$242
$1,723
$278
$548
$305
$4,686
$469
$3,560
$241
$0
$1,297
$655
$210
$66
$107
$62
$11
$688
$0
$511
$12
$6,891
$160
$212
$21
$57
$811
$0
$0
$0
$6,595
$9
$6
$58
$289
$25
$0
$1,368
$0
$248
$3,671
$93
$2,158
$450
$946
$104
$161
$1,808
$286
Exhibit PB-28
31
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Reserve
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Pollution Prevention Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
Hazardous Material Reduction
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Pollution Prevention Non-Recurring
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
Hazardous Material Reduction
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Pollution Prevention Non-Recurring
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Hazardous Material Reduction
Other Pollution Prevention Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Hazardous Material Reduction
Other Pollution Prevention Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA D-Solid Waste
Other Pollution Prevention Non-Recurring
Manpower
Education & Training
Pollution Prevention Recurring
Hazardous Material Reduction
0401854F
0401854F
0401854F
0401854F
0401854F
0401854F
0401854F
0401854F
0401854F
0505854F
0505854F
0505854F
0505854F
0505854F
0505854F
0505854F
0505854F
0505954F
0505954F
0505954F
0505954F
0505954F
0505954F
0505954F
0505954F
0708054F
0708054F
0708054F
0708054F
0708054F
0708054F
0708054F
0708054F
0708054F
0805754F
0805754F
0805754F
0805754F
0805754F
0805754F
0805754F
0805754F
0805854F
0805854F
0805854F
0805854F
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
$2,098
$99
$1,830
$0
$167
$24
$17
$105
$37
$72
$181
$196
$56
$489
$238
$42
$180
$709
$0
$116
$566
$10
$458
$0
$277
$3,442
$16
$8,507
$1,035
$1,021
$2,045
$0
$717
$44
$975
$285
$177
$38
$99
$90
$169
$200
$0
$5
$187
$0
$1,969
$101
$1,986
$0
$146
$193
$295
$581
$633
$224
$565
$609
$173
$1,522
$740
$130
$564
$963
$0
$158
$769
$13
$623
$0
$377
$3,848
$17
$8,338
$3,132
$3,090
$6,187
$0
$2,171
$133
$806
$545
$125
$16
$43
$39
$72
$41
$0
$5
$197
$15
$1,421
$28
$342
$0
$169
$124
$179
$389
$384
$79
$199
$215
$61
$537
$261
$46
$200
$246
$0
$40
$197
$3
$159
$0
$97
$3,831
$17
$8,599
$631
$623
$1,247
$0
$437
$27
$730
$316
$89
$29
$77
$70
$131
$498
$0
$0
$6
$7
$1,363
$28
$355
$0
$171
$129
$187
$404
$402
$76
$192
$207
$59
$518
$252
$44
$192
$249
$0
$41
$199
$3
$161
$0
$98
$3,827
$17
$8,852
$559
$552
$1,105
$0
$388
$24
$788
$323
$80
$29
$76
$69
$129
$470
$0
$0
$6
$7
$1,389
$29
$348
$0
$175
$131
$189
$410
$406
$77
$194
$209
$59
$522
$253
$45
$192
$254
$0
$42
$202
$3
$164
$0
$99
$3,903
$18
$9,030
$622
$614
$1,229
$0
$431
$26
$792
$328
$322
$26
$70
$63
$118
$231
$0
$0
$6
$6
$1,440
$30
$342
$0
$180
$224
$340
$674
$728
$77
$195
$210
$60
$524
$255
$45
$193
$258
$0
$42
$206
$3
$167
$0
$101
$4,041
$18
$9,150
$614
$605
$1,212
$0
$425
$26
$820
$335
$205
$25
$67
$60
$113
$336
$0
$0
$6
$5
$1,479
$30
$355
$0
$182
$313
$484
$927
$1,038
$79
$198
$214
$61
$534
$260
$46
$197
$585
$0
$96
$467
$8
$378
$0
$227
$4,148
$18
$9,308
$576
$568
$1,138
$0
$399
$25
$820
$342
$302
$26
$69
$63
$117
$268
$0
$0
$6
$6
$1,517
$31
$362
$0
$186
$260
$398
$780
$855
$80
$202
$218
$62
$545
$265
$47
$203
$588
$0
$97
$470
$8
$380
$0
$229
$4,257
$19
$9,465
$589
$581
$1,163
$0
$408
$25
$820
$351
$349
$27
$72
$65
$122
$250
$0
$0
$6
$7
Exhibit PB-28
32
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Guard
Guard
Guard
Guard
Guard
Guard
Guard
Reserve
Reserve
Reserve
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Foreign
Foreign
Foreign
Foreign
Foreign
Foreign
Foreign
Foreign
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Conservation Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Non-Recurring
Conservation Recurring
Conservation Recurring
Conservation Recurring
Compliance Non-Recurring
Conservation Non-Recurring
Manpower
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Threatened & Endangered Species
Wetlands
Manpower
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Threatened & Endangered Species
Wetlands
Manpower
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Wetlands
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Threatened & Endangered Species
Wetlands
Conservation Recurring
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Manpower
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
Other Natural Resources Non-Recurring
Threatened & Endangered Species
Wetlands
Manpower
Education & Training
Conservation Recurring
Planning
Historical & Cultural Resources
0208853F
0208853F
0208853F
0208853F
0208853F
0208853F
0208853F
0208853F
0305853F
0305853F
0305853F
0305853F
0305853F
0305853F
0305853F
0305853F
0401853F
0401853F
0401853F
0401853F
0401853F
0401853F
0401853F
0505853F
0505853F
0505853F
0505853F
0505853F
0505853F
0505853F
0505953F
0505953F
0505953F
0708053F
0708053F
0708053F
0708053F
0708053F
0708053F
0708053F
0708053F
0805753F
0805753F
0805753F
0805753F
0805753F
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3840 O&M,ANG
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3740 O&M,USAF Reserve
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
3400 O&M,USAF
$1,107
$68
$2,951
$0
$363
$367
$0
$4
$160
$588
$2,906
$1,277
$358
$909
$169
$0
$1,462
$6
$1,160
$0
$0
$607
$333
$0
$289
$1,980
$239
$389
$66
$30
$289
$19
$154
$5,864
$14
$6,826
$0
$10,040
$3,610
$0
$0
$450
$0
$392
$0
$0
$1,025
$69
$1,574
$0
$370
$375
$0
$4
$0
$600
$3,128
$2,092
$586
$1,489
$276
$0
$1,180
$1
$333
$0
$0
$73
$40
$0
$167
$1,143
$138
$224
$38
$17
$481
$32
$256
$5,443
$15
$7,556
$0
$3,081
$1,108
$0
$0
$181
$0
$3,131
$0
$0
$799
$71
$859
$0
$377
$383
$0
$4
$0
$612
$3,190
$1,724
$483
$1,228
$228
$0
$1,306
$2
$620
$0
$0
$218
$119
$0
$148
$1,012
$122
$199
$34
$15
$145
$10
$77
$5,779
$15
$7,102
$0
$4,470
$1,608
$0
$0
$185
$0
$238
$0
$0
$821
$72
$857
$0
$385
$390
$0
$4
$0
$624
$3,255
$1,727
$484
$1,230
$228
$0
$1,347
$2
$645
$0
$0
$228
$125
$0
$137
$942
$114
$185
$31
$14
$148
$10
$79
$5,944
$15
$7,244
$0
$4,427
$1,592
$0
$0
$190
$0
$238
$0
$0
$836
$74
$1,074
$0
$393
$398
$0
$4
$0
$637
$3,320
$1,753
$491
$1,248
$231
$0
$1,377
$2
$669
$0
$0
$237
$130
$0
$137
$938
$113
$184
$31
$14
$456
$30
$243
$6,058
$15
$7,389
$0
$4,368
$1,571
$0
$0
$193
$0
$254
$0
$0
$868
$75
$869
$0
$400
$406
$0
$4
$0
$649
$3,387
$1,760
$493
$1,253
$232
$0
$1,417
$2
$650
$0
$0
$228
$125
$0
$137
$938
$113
$184
$31
$14
$152
$10
$81
$6,296
$16
$7,536
$0
$4,175
$1,502
$0
$0
$201
$0
$256
$0
$0
$892
$77
$944
$0
$408
$414
$0
$4
$0
$663
$3,453
$1,800
$504
$1,282
$238
$0
$1,457
$2
$668
$0
$0
$233
$128
$0
$139
$956
$116
$188
$32
$14
$155
$10
$83
$6,473
$16
$7,689
$0
$3,999
$1,438
$0
$0
$207
$0
$1,271
$0
$0
$914
$78
$985
$0
$416
$422
$0
$4
$0
$676
$3,523
$1,828
$512
$1,302
$241
$0
$1,500
$2
$691
$0
$0
$242
$132
$0
$142
$977
$118
$192
$33
$15
$158
$11
$84
$6,653
$16
$7,845
$0
$4,078
$1,466
$0
$0
$213
$0
$268
$0
$0
Exhibit PB-28
33
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Guard
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Guard
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Foreign
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Conservation Recurring
Conservation Recurring
Pollution Prevention Recurring
Pollution Prevention Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Pollution Prevention Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Compliance Non-Recurring
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Manpower
Safe Drinking Water Act
Clean Air Act
Clean Water Act
RCRA C-Hazardous Waste
RCRA I-Underground Storage Tanks
Clean Water Act
Clean Water Act
Clean Air Act
Safe Drinking Water Act
Clean Water Act
Safe Drinking Water Act
Safe Drinking Water Act
Clean Water Act
Clean Water Act
RCRA C-Hazardous Waste
Clean Water Act
Clean Air Act
RCRA C-Hazardous Waste
Clean Air Act
Clean Water Act
Other Compliance Non-Recurring
RCRA C-Hazardous Waste
Clean Water Act
Other Compliance Non-Recurring
0805753F
0805853F
0401854F
0805754F
0101856F
0305856F
0401856F
0708056F
0805756F
0901256F
0505256F
0207456F
0207456F
0207456F
0207456F
0207456F
0207456F
0305856F
0305856F
0305856F
0401856F
0401856F
0708056F
0708056F
0505256F
0708054F
0708054F
0708054F
0708011F
0708011F
0708011F
0708011F
0708011F
0708011F
0708011F
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3500 Mil Per,USAF
3850 NG Personnel,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3300 Milcon,USAF
3830 Milcon,USAF
3080 Othr Proc.,USAF
3080 Othr Proc.,USAF
3080 Othr Proc.,USAF
3010 Aircraft Proc.,USAF
3010 Aircraft Proc.,USAF
3010 Aircraft Proc.,USAF
3010 Aircraft Proc.,USAF
3020 Missile Proc.,USAF
3020 Missile Proc.,USAF
3020 Missile Proc.,USAF
$6
$0
$3
$138
$417
$282
$1,022
$197
$845
$3,156
$2,401
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,119
$3,748
$7,190
$2,212
$1,217
$64
$126
$7
$0
$62
$7
$737
$412
$697
$138
$1,031
$2,865
$2,285
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,144
$3,831
$7,351
$2,262
$1,228
$65
$128
$7
$0
$3
$7
$738
$414
$757
$138
$904
$2,815
$2,706
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,155
$3,868
$7,420
$2,282
$727
$38
$75
$7
$0
$3
$7
$760
$426
$584
$142
$931
$2,899
$2,773
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,156
$3,871
$7,427
$2,284
$724
$38
$75
$7
$0
$3
$7
$782
$438
$601
$146
$957
$2,979
$2,870
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,177
$3,942
$7,563
$2,326
$724
$38
$75
$7
$0
$3
$7
$811
$453
$623
$151
$992
$3,087
$2,973
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,198
$4,012
$7,697
$2,368
$718
$38
$75
$7
$0
$3
$7
$839
$469
$644
$155
$1,024
$3,192
$3,075
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,219
$4,084
$7,835
$2,410
$731
$39
$76
$7
$0
$3
$7
$867
$484
$666
$160
$1,059
$3,297
$3,175
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,241
$4,156
$7,974
$2,453
$737
$39
$76
Exhibit PB-28
34
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
SUMMARY OF BUDGETED ENVIRONMENTAL PROJECTS
Class
U
U
U
U
U
TreasuryCode
3010 AIRCRAFT PROC., AF
3020 MISSILE PROC., AF
3400 O&M, AF
3400 O&M, AF
3600 RDT&E, AF
BACode
07 AIRCRAFT SUPT EQ
02 OTHER MISSILES
04 ADMIN & SRVWD ACT
04 ADMIN & SRVWD ACT
04 ADV DEV/DEM
EnvironmentalProgram
Pollution Prevention
Pollution Prevention
Pollution Prevention
Cleanup
Pollution Prevention
FY2008
$4,709
$958
$2,859
$6,580
$10,660
FY2009
$2,504
$980
$1,958
$6,580
$11,645
FY2010
$3,514
$0
$8,000
$7,580
$2,896
FY2011
$3,561
$0
$8,000
$7,380
$2,919
FY2012
$3,623
$0
$4,000
$6,580
$2,965
FY2013
$3,688
$0
$4,000
$6,580
$3,007
FY2014
$3,754
$0
$4,000
$6,580
$3,053
FY2015
$3,821
$0
$4,000
$6,580
$3,101
Exhibit PB-28A
35
Summary of Budgeted Environmental Projects
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
Operation and Maintenance, Air Force
OPERATIONAL RANGE SUSTAINMENT AND ENVIRONMENTAL MANAGEMENT
Class
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Component
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
Active
RangeLocation
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
RangePrograms
Range Inventory
Range Inventory
Range Inventory
Range Inventory
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Assessments
Range Response Actions
Range Response Actions
Range Response Actions
Range Response Actions
Range Response Actions
Range Response Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
Range Sustainment Actions
RangeManagementActivities
Land Ranges
Land Ranges
Land Ranges
Land Ranges
Environmental Range Assessments
Environmental Range Assessments
Environmental Range Assessments
Environmental Range Assessments
Environmental Range Assessments
Other Range Assessment Costs
Other Range Assessment Costs
Other Range Assessment Costs
Other Range Assessment Costs
Other Range Assessment Costs
All Environmental Range Response Actions
All Environmental Range Response Actions
All Environmental Range Response Actions
All Environmental Range Response Actions
All Environmental Range Response Actions
All Environmental Range Response Actions
Integrated Natural Resource Management Plans
Integrated Natural Resource Management Plans
Integrated Natural Resource Management Plans
Integrated Natural Resource Management Plans
Integrated Natural Resource Management Plans
Integrated Natural Resource Management Plans
Other Sustainment Actions
Other Sustainment Actions
Other Sustainment Actions
Other Sustainment Actions
Other Sustainment Actions
Other Sustainment Actions
RangeResourceDetail
# of Ranges
# of Acres
# Ranges with Environmental Range Assessments
# Acres with Environmental Range Assessments
O&M
RDT&E
Proc
DWCF
MilPers
O&M
RDT&E
Proc
DWCF
MilPers
O&M
RDT&E
Proc
DWCF
MilPers
MilCon
O&M
RDT&E
Proc
DWCF
MilPers
MilCon
O&M
RDT&E
Proc
DWCF
MilPers
MilCon
FY2008
33
7.8
33
7.8
$8,920
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$8,878
$0
$0
$0
$0
$0
$19,200
$0
$0
$0
$0
$0
FY2009
33
7.8
33
7.8
$1,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$9,073
$0
$0
$0
$0
$0
$21,300
$0
$0
$0
$0
$0
FY2010
33
7.8
33
7.8
$1,022
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$9,273
$0
$0
$0
$0
$0
$11,900
$0
$0
$0
$0
$0
FY2011
33
7.8
33
7.8
$3,744
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$9,477
$0
$0
$0
$0
$0
$13,600
$0
$0
$0
$0
$0
FY2012
33
7.8
33
7.8
$4,084
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$9,686
$0
$0
$0
$0
$0
$13,899
$0
$0
$0
$0
$0
FY2013
33
7.8
33
7.8
$2,042
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$9,899
$0
$0
$0
$0
$0
$14,205
$0
$0
$0
$0
$0
FY2014
33
7.8
33
7.8
$1,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$10,117
$0
$0
$0
$0
$0
$14,518
$0
$0
$0
$0
$0
FY2015
33
7.8
33
7.8
$1,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$10,339
$0
$0
$0
$0
$0
$14,837
$0
$0
$0
$0
$0
Exhibit PB-28B
36
Operational Range Sustainment and Environment Management
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
FTE Changes
1. FY 2008 FTEs
Strategic Forces
Strategic Offense
Strategic Defense
Strategic C3
Total
General Purposes Forces
Tactical Air Forces
Mobility Forces
Special Ops Forces
Counter Drug
Total
Intelligence and Communication
Intelligence
Communications
Information & Management Activities
Command & Control Activities
Total
General Research and Development
Science & Technology Programs
RDT&E Management & Support
Total
Other Defense Wide Activities
Geophysical Sciences
Space Launch Support
International Support
Logistics Support
Supply Operations
Maintenance Operations
US Direct Hire
155,104
Foreign National
Direct Hire
Indirect Hire
917
Total
6,402
13
83
-70
13
440
1,028
-389
-198
-1
440
-118
-95
33
-20
-36
-118
-68
-162
36
58
-427
-5
-166
37
162,423
13
83
-70
-1,134
-1,117
-15
222
218
4
-2
-1,134
-10
222
-19
-10
-19
-10
-19
-19
-8
-7
-11
-13
-7
-2
13
-472
129
-400
-198
-3
-472
-147
-95
4
-20
-36
-147
-94
-170
36
40
-442
-5
-166
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
FTE Changes
Other Logistics Support
Security & Investigative Activities
Total
Personnel Support
Personnel Acquisition
Training
Medical
Other Personnel Support
Individuals
Total
Other Centralized Support
Departmental HQs
US Direct Hire
-201
-55
-427
-53
-8
-110
Foreign National
Direct Hire
Indirect Hire
-13
-13
-1
38
-2
-2
-312
-1
65
-53
1,269
1,269
Total
-1
-16
-296
-312
-7
-7
-201
-70
-442
-366
-8
-111
49
-296
-366
1,262
1,262
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
FTE Changes
2. FY 2009 FTEs
Strategic Forces
Strategic Offense
Strategic Defense
Strategic C3
Total
General Purposes Forces
Tactical Air Forces
Mobility Forces
Special Ops Forces
Counter Drug
Total
Intelligence and Communication
Intelligence
Communications
Command & Control Activities
Total
General Research and Development
Security & Investigative Activities
Total
Other Defense Wide Activities
Geophysical Sciences
Space Launch Support
International Support
Logistics Support
Supply Operations
Other Logistics Support
Maintenance Operations
Total
Personnel Support
US Direct Hire
160,524
Foreign National
Direct Hire
Indirect Hire
2,100
Total
6,239
168,863
-4
-3
-4
-3
-1
-4
79
80
-1
-4
79
80
-1
79
224
8
215
1
224
-1
79
224
8
215
1
224
15
15
15
15
-690
-690
30
-720
-690
3
30
-720
-690
-364
39
-367
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
FTE Changes
Personnel Acquisition
Training
Medical
Other Personnel Support
Individuals
Other Centralized Support
Departmental HQs
3. FY 2010 FTEs
US Direct Hire
Foreign National
Direct Hire
Indirect Hire
Total
3
3
-367
-367
20
20
6,597
175,322
20
20
166,659
40
2,066
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
4. SUMMARY
US Direct Hire
Foreign National
Direct Hire
Indirect Hire
Total
FY 2008
O&M Air Force
Direct Funded
Reimbursable Funded
83,155
64,110
19,045
Air Force Reserve
Direct Funded
Reimbursable Funded
12,935
12,659
276
12,935
12,659
276
Air National Guard
Direct Funded
Reimbursable Funded
23,386
22,564
822
23,386
22,564
822
RDT&E
Direct Funded
Reimbursable Funded
7,849
6,198
1,651
7,849
6,198
1,651
DOD Working Capital Fund
Direct Funded
Reimbursable Funded
Total Air Force
Direct Funded
Reimbursable Funded
1,972
852
1,120
6,296
2,864
3,432
91,423
67,826
23,597
26,503
108
219
26,830
26,503
108
219
26,830
153,828
105,531
48,297
2,080
852
1,228
6,515
2,864
3,651
162,423
109,247
53,176
41
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
4. SUMMARY
US Direct Hire
Foreign National
Direct Hire
Indirect Hire
Total
FY 2009
O&M Air Force
Direct Funded
Reimbursable Funded
88,919
74,095
14,824
Air Force Reserve
Direct Funded
Reimbursable Funded
13,891
13,599
292
13,891
13,599
292
Air National Guard
Direct Funded
Reimbursable Funded
24,276
23,463
813
24,276
23,463
813
RDT&E
Direct Funded
Reimbursable Funded
7,087
5,649
1,438
7,087
5,649
1,438
DOD Working Capital Fund
Direct Funded
Reimbursable Funded
Total Air Force
Direct Funded
Reimbursable Funded
1,978
1,844
134
6,375
3,451
2,924
97,272
79,390
17,882
25,984
122
231
26,337
25,984
122
231
26,337
160,157
116,806
43,351
2,100
1,844
256
6,606
3,451
3,155
168,863
122,101
46,762
42
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
4. SUMMARY
US Direct Hire
Foreign National
Direct Hire
Indirect Hire
Total
FY 2010
O&M Air Force
Direct Funded
Reimbursable Funded
95,304
80,284
15,020
Air Force Reserve
Direct Funded
Reimbursable Funded
14,336
14,042
294
14,336
14,042
294
Air National Guard
Direct Funded
Reimbursable Funded
24,281
23,453
828
24,281
23,453
828
RDT&E
Direct Funded
Reimbursable Funded
7,849
6,198
1,651
DOD Working Capital Fund
Direct Funded
Reimbursable Funded
Total Air Force
Direct Funded
Reimbursable Funded
1,944
1,846
98
6,364
3,454
2,910
103,612
85,584
18,028
2
2
7,851
6,200
1,651
24,889
122
231
25,242
24,889
122
231
25,242
166,659
123,977
42,682
2,066
1,846
220
6,597
3,456
3,141
175,322
129,279
46,043
43
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
4. SUMMARY
FY 2008
FY 2009
FY 2010
O&M Air Force
Direct Funded
Reimbursable Funded
91,423
67,826
23,597
97,272
79,390
17,882
103,612
85,584
18,028
Air Force Reserve
Direct Funded
Reimbursable Funded
12,935
12,659
276
13,891
13,599
292
14,336
14,042
294
Air National Guard
Direct Funded
Reimbursable Funded
23,386
22,564
822
24,276
23,463
813
24,281
23,453
828
RDT&E
Direct Funded
Reimbursable Funded
7,849
6,198
1,651
7,087
5,649
1,438
7,851
6,200
1,651
26,830
26,337
25,242
26,830
26,337
25,242
162,423
109,247
53,176
168,863
122,101
46,762
175,322
129,279
46,043
DOD Working Capital Fund
Direct Funded
Reimbursable Funded
Total Air Force
Direct Funded
Reimbursable Funded
44
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
MANPOWER CHANGES IN FULL TIME EQUIVALENT STRENGTH
FY 2008 through FY 2010
5. Summary of Changes
45
Exhibit PB-31Q Manpower Changes in FTE Strength
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
REVENUE FROM LEASING OUT DoD ASSETS
($ in Thousands)
FY 2008 FY 2009 FY 2010
Total Revenue from Lease of Air Force Real Property
$3,887
$4,351
46
$5,213
Exhibit PB-34A Revenue from Leasing Out DoD Assets
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
PROCEEDS FROM TRANSFER OR DISPOSAL OF DoD REAL PROPERTY
($ in Thousands)
FY 2008 FY 2009 FY 2010
1. Disposal Action
$0
$0
$0
$0
$1.3
$0
$0
$0
$0
$0
$0
(a) Explanation of Disposal Action: Conveyance of Withdrawn land back to
Bureau of Land Management Christmas Valley, OR (ACC)
(b) Actual or Planned Use of Proceeds Generated from Disposal:
Maintenance and repairs
2. Disposal Action
(a) Explanation of Disposal Action: Outer Marker Annex in Johnson County
MO – 5 miles from end of runway at Whiteman AFB, MO (ACC)
(b) Actual or Planned Use of Proceeds Generated from Disposal:
Maintenance and repairs
3. Disposal Action
(a) Explanation of Disposal Action: 20.13 acres of land exchange with private landowner
at Dyess AFB, TX (ACC)
(b) Actual or Planned Use of Proceeds Generated from Disposal:
Maintenance and repairs
4. Disposal Action
$0
(a) Explanation of Disposal Action: Moscow Over-the-Horizon Backscatter
Radar site (ACC)
Exhibit PB-34B
47
Proceeds from Transfer or Disposal of DoD Real Property
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
PROCEEDS FROM TRANSFER OR DISPOSAL OF DoD REAL PROPERTY
(b) Actual or Planned Use of Proceeds Generated from Disposal:
Maintenance and repairs
5. Disposal Action
$0
$0
$0
(a) Explanation of Disposal Action: Transfer of Johnston Atoll to Dept of
Interior (PACAF)
(b) Actual or Planned Use of Proceeds Generated from Disposal:
Maintenance and repairs
Total Department of The Air Force
$0
$1.3
$0
Exhibit PB-34B
48
Proceeds from Transfer or Disposal of DoD Real Property
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
INTERNATIONAL MILITARY HEADQUARTERS
FY 08 ACTUAL
MILITARY
END
STRENGTH
FY 09 ESTIMATE
80
59
18
18
CIV
END
STR
FY 11 ESTIMATE
TOT
OBL
($000)
TOTAL
OFF ENL
MIL
77
1,515
MILITARY
END
STRENGTH
CIV
TOT
END OBL
STR ($000)
TOTAL
OFF ENL
MIL
TOTAL
OFF ENL
MIL
INTERNATIONAL MILITARY
ORGANIZATIONS
North American Air Defense Command
MPAF
45
35
OMAF
North Atlantic Treaty Organization
MPAF
258 334
United Nations Command, Korea/
US Combined Forces Command, Korea
MPAF
50
51
Total International Military
Organizations
353 420
MILITARY
END
STRENGTH
CIV TOT
END OBL
STR ($ 000)
FY 10 ESTIMATE
59
37
18
CIV
TOT
END OBL
STR ($ 000)
TOTAL
OFF ENL
MIL
77
59
55
3,209
MILITARY
END
STRENGTH
17
76
56
4,870
5,086
592
53,149 258
516
774
61,033
258
516
774
72,148
258
516
774
72,467
101
9,438
50
43
93
9,527
50
43
93
10,033
50
43
93
9,995
64,102 367
577
73,769
367
577
87,051
367
576
773
18
944
37
49
944
55
943
56
87,548
Exhibit PB-55 International Military Headquarters
DEPARTMENT OF THE AIR FORCE
Fiscal Year (FY) 2010 Budget Estimates
AIR SOVEREIGNTY ALERT MISSION
Air Sovereignty Alert (ASA): Air Sovereignty Operations encompass those actions required to maintain peacetime control of U.S. and Canadian airspace. Air Sovereignty Alert
(ASA) is 24 hours a day, 365 days a year ground alert posture of armed fighter aircraft. ASA fighters, tankers, early warning and operations, maintenance, and support personnel are
strategically positioned throughout the U.S. and Canada. NORAD and USPACOM are charged with the aerospace warning and aerospace control missions for North America. ASA is
included in these mission sets.
Command and Control (C2): AFNORTH provides an Air Force Component Headquarters for NORTHCOM, delivering operational C2 for Homeland Air Defense.
A. Military Personnel
Military Personnel, Air Force
Military Personnel, Air National Guard (ANG)
End Strength, Air National Guard (ANG)
Total Military Personnel Costs:
B. Medicare-Eligible Retiree Health Care Fund
Medicare-Eligible Retiree Health Care Fund, ANG
C. Operation & Maintenance
Flying Hour Costs, Active Air Force
FY 2008 Actuals
FY 2009 Appropriated
FY 2010 President's Budget
Active Military Personnel Support is provided to the ASA mission but is not solely dedicated to this mission.
$192,618
$213,010
$226,422
2,714
2,626
2,657
$192,618
$213,010
$226,422
FY 2008 Actuals
FY 2009 Appropriated
FY 2010 President's Budget
$8,723
$8,488
$9,222
FY 2008 Actuals
FY 2009 Appropriated
FY 2010 President's Budget
Active Flying Hours are not tracked separately for the ASA mission.
Other Mission Costs, Active Air Force
$33,280
Flying Hour Costs, Air National Guard
$4,971
$5,197
$5,213
$69,274
$52,858
$53,562
127
249
249
Other Mission Costs, Air National Guard
End Strength, Air National Guard
Total Operation & Maintenance Costs:
D. Military Construction
Incremental funding for refueling, Early Warning, and AF alert sites.
$107,525
$58,055
$58,775
FY 2008 Actuals
FY 2009 Appropriated
FY 2010 President's Budget
ANG: FY09--Alert Crew Headquarters (Buckley AFB,CO)
$4,200
50
Air Sovereignty Alert Exhibit
Download