COMPACFLT N4 OIF Lessons Learned & Fleet Quick Hits

advertisement
COMPACFLT N4
OIF Lessons Learned
&
Fleet Quick Hits
RDML Michael S. Roesner
OIF Lessons Learned
Fleet Quick Hits
Quick Hits
Lessons Learned
 ASDOF
 Expediting
 Bandwidth / ADP Vision
 Transportation / Material Pipeline Ownership
 Time Phased Force Deployment Data
(TPFDD)
 Full Spectrum Logistics Support
 Numbers Matter
 FRP Surge / Remote Sustainment
ASDOF
Quick Hits
Lessons Learned
 ASDOF initiatives alive and well…
PAPA
Postal
Navy Cash
 Recent initiatives include Cleaning
Consolidation and Medical Prime Vendor.
 Need to increase attention on Supply OPS.
Need to Refocus on ASDOF!
Expediting
Quick Hits
Lessons Learned
 Fragmented Ownership
Functionally – few steps in process.
Operationally – Pass through various
support, transportation and Tycoms/Fleets.
 Ground Truth
Too many fingers in the pie, at time’s hard
to tell what the answer is.
 Need Single Umbrella across
Functional/Operational Boundaries.
Desired End State…Streamlined process,
manned appropriately, TYCOM controlled
Bandwidth/ADP
Quick Hits
Lessons Learned
 Ensure LOG bandwidth requirements have adequate
prioritization and representation.
 Factor available bandwidth into effective capability and
labor savings of new systems.
 ADP Way Ahead
Proceed with ENTCSS implementation with ERP as
the ultimate desired end state.
ENTCSS will eliminate afloat legacy systems.
Need Sponsorship for Bandwidth
Quick Hits
Lessons Learned
Transportation
 Transportation Chain Integration
 Synchronize Airlift with CLF
TARAWA
Thur
Fri
Sat
Sun
Mon
Tues
Wed
Thur
Fri
Sat
Sun
Mon
Tue
Wed
Thur
13Mar 14Mar 15Mar 16Mar 17Mar 18Mar 19Mar 20Mar 21Mar 22Mar 23Mar 24Mar 25Mar 26Mar 27Mar
72 hour time period
Met 72 hour Pallets Pallets Pallets Pallets Pallets Pallets Pallets Pallets Pallets
Fm 13th Waiting Waiting Waiting Waiting Finally
goal, but
OH: 60 OH: 60 Fm 13th
Arrived
Next
Next
Next
Next
Got on
missed CLF 13th MAR Fm 13th Shipped “on time” CLF
CLF
CLF
CLF
CLF
load date!
CLF Load Dates
14 Days BAH
to Ship
Right stuff, in
Missed
the right
Opportunity
CLF Delivery Dates
place, at the
wrong time.
LINCOLN
Pallets
FM 13th
Arrive
72 hour time period
Met 72 hour Pallets Pallets Pallets Palletsth Pallets Pallets Pallets Pallets Pallets
Fm 13 Early for Early for
Waiting Finally
Loaded
goal and was OH: 60 OH: 60 Fm 13th Arrived Next
Next
Next
Got on
th
th
On CLF
early for load 13 MAR Fm 13 Shipped Early
CLF
CLF
CLF
CLF
date!
CLF Load Date
9 Days BAH
Pallets
to Ship
FM 13th
Arrive
Align Metric to CLF Load Dates!
CLF Delivery Date
Material Pipeline
Ownership
Depot
Overhaul
Quick Hits
Lessons Learned
Storage
MPC
ATAC
Ship
Supply/Maintenance
The only piece of the repair
cycle that is Fleet controlled!
TPFDD FLOW
Quick Hits
Lessons Learned
 OIF TPFDD force flow was not executed as planned.
 Long lead time to deploy forces provided components
best sourcing opportunity.
 Future conflicts may not provide us with the luxury of
time to deploy forces as we experienced during OIF.
 Access to Battle Space not Guaranteed.
Full Spectrum Logistics Support
Quick Hits
Lessons Learned
 Full Spectrum Logistics Support should be applied in future
conflicts/non-traditional areas….establish “off the shelf” Log
Plans.
 Planning cell inclusive of DLA, NAVSUP, FLEETS and
TYCOMS to provide:




Mobile NOACTs
ATACs
MPCs
Establish Inventories w/out footprint…HULL Prime Vendor
 CNAP’s aviation logistics support strategy for OIF was an
overwhelming success!
Numbers Matter
Quick Hits
Lessons Learned
 Mission Area Synergies from multiple ARG/CVBG.
 Fully develop/exploit this technology to enable rapid
logistics reconfiguration of future CSG’s/ESG’s.
F/A-18C/D APG 65/73 Radar
AVDLR Range & Depth
FRP Surge/Remote Sustainment
Quick Hits
Lessons Learned
 DLA Partnership
 Guam … DDC signed Letter of Intent to assume physical
distribution / MPC operations in CY-04.
 Sigonella positioning being enhanced.
 Singapore … looking for DSCP to stand up HULL Prime
Vendor, eliminate footprint
 Looking for future opportunities
 NAVSUP
 Traditional Support in Non-Traditional Areas to
include LSC, ATAC, NOACT etc.
 Guam
Sigonella
Singapore
 Mobile Capability…Potential to team with ELSF
 Other Blue/Green Opportunities
FRP Surge/Remote Sustainment
GET READY…STAY READY
Quick Hits
Lessons Learned
FRP Surge/Remote Sustainment
Quick Hits
Lessons Learned
 Stock Positioning
 Need to make sure material is positioned properly
to enhance readiness and is maintained during
IDTC. During both surge (IDRC) and sustainment
operations.
 Don’t Apply Lesson Learned to Yesterday’s
Conflict…Apply them to our Future Vision.
Download