CSB Remodel Project University of Colorado Colorado Springs (UCCS) Facilities Services Department

advertisement
Facilities Services
1420 Austin Bluffs Parkway
Colorado Springs, Colorado 80918
(719) 255-3505 Fax: (719) 255-3222
Addendum No. 2
CSB Remodel Project
University of Colorado Colorado Springs (UCCS)
Facilities Services Department
Date:
Monday, March 16, 2015
To:
All Bidders
From:
University of Colorado at Colorado Springs
Facilities Planning and Construction
Questions:
01. On sheet A1 in room 236 the door has a key note 10B which is to “Reuse existing doors
and frames.” On sheet A4 the door schedule calls for room 236 to receive a new door
and frame? Please advise if that room is to receive new door and frame or to reuse.
Response: The spec noted for door 236 on sheet A4 is correct. This will have a new door with
vision glazing and frame.
02. If room 236 is to get a new door and frame does the glass need to be fire rated?
Response: The glazing does not require to be fire rated.
03. Please confirm the Builder’s Risk policy will be covered by the owner since it is a
remodel?
Response: Per Insurance Requirements form attached with the bid documents, Contractor is
required to purchase and maintain the builder’s risk insurance regardless if the project is a new
building, addition to existing or just a remodel.
04. For Alternate #1 does the existing VCT under the existing carpet have to be removed
prior to the new CPT-1 being installed?
Response: Flash patch area where walls are to be removed to create an even surface. New
carpet will be installed over existing VCT.
05. For door 206 and 209 in the door schedule calls for these doors to be reused, is the
hardware to be reused as well?
Response: Yes
06. Please advise height from floor to ceiling structure that shall be used for the new wall
construction?
Response: Floor to bottom of structure is about 12’-6 ½” based on as-built drawings attached.
07. There is nothing stated on the plans asking to re-program or re-address so please confirm
that you will not be requiring setpoint controls for the relocation of the thermostats?
Response: No setpoint controls is required to relocate existing thermostat.
08. For Alternate #3 do you want the window frame to be hollow metal or aluminum?
Response: hollow metal
09. Sheet A4, for type B door – bottom of vision glazing to be at 42” A.F.F. Re: Door and
Window schedule for required rating.