Maintenance Decision Support System (MDSS) The FHWA Road Weather Management Program for Decision Support To the Second MDSS Prototype Review Hanover, NH June 21, 2001 Gary G. Nelson Mitretek Systems Inc. gnelson@mitretek.org 202 488 5718 Contents Mit re tek Ro le Federal Highway Administration (FHWA) Road Weather Management Program 2 Surface Transportation Weather Decision Support Requirements (STWDSR) project Maintenance Decision Support System (MDSS) project FHWA/Mitretek Mitretek Role •Mitretek Systems, Inc., is a non-profit, non-competitive, government services corporation Created from Mitre in 1996 to serve non-FFRDC* work. * Federally Funded Research and Development Corporation •Mitre/Mitretek has supported the FHWA Intelligent Transportation System (ITS) program since inception: Research, program development, procurement support. 3 FHWA/Mitretek Federal Road Weather Programs Other USDOT Agencies FAA, FTA, FRA, RSPA, USCG Federal Highway Administration FHWA FHWA American Association of State Highway and Transportation Officials AASHTO Public and Fire Weather and other NWS offices Jeff Paniatti Operations Core Business Unit ITS-JPO Christine Johnson National Weather Service NWS ITS Joint Program Office HOP Office of the Federal Coordinator for Meteorology Sam Williamson OFCM Highway Research Office of Transportation Operations Shelley Row Gary Larsen HRD HOTO Road Weather Management Program Highway Research-Operations Stakeholders: Paul Pisano Rudy Persaud State DOTs HOTO HRDO Private Vendors Road Weather Program National Labs 4 FHWA/Mitretek Road Weather Management Program Goals 1. Develop improved weather information systems that meet the demands of all users and operators; 2. Develop improved maintenance technologies for winter mobility, and; 3. Develop traffic operations/incident management procedures under all weather events. 5 FHWA/Mitretek Road Weather Management Program Objectives a. Build relations between meteorologists and transportation professionals…to create a common vision and support state efforts; b. Improved decision support systems...; c. Advanced maintenance technologies…; d. Road weather management practices for traffic and incident managers…; e. Develop outreach materials... 6 FHWA/Mitretek Scope of Road Weather Management Program Improve Interfaces to Meteorological Road Weather Information Systems (RWIS) Environmental Sensor Stations (ESS) The ITS Services Improve Highway Operations to meet Goals Define Weather Threats Improve Transportation Impact (Goals) Promote and Develop Information Systems to Support Highway Operations (with respect to weather threats) 7 FHWA/Mitretek Road Weather Management Program Progress Prior FHWA research in RWIS Surface Transportation Weather Decision Support Requirements (STWDSR) Project FHWA Weather Team Formed from Rural ITS FHWA Operations Unit formed 1970-1997 1997 First Road Weather Symposium 1998 1999 First OFCM WIST Symposium Foretell Project launched 8 STWDSR Meetings 1 and 2 2000 MDSS Reviews 1, 2 and 3 2001 2002 Second OFCM WIST Symposium MDSS Project Launched FHWA/Mitretek STWDSR Scope Goals Decision Support System (WIST-DSS) The Intelligent Transportation System (ITS) 9 System Input Requirements Safety Computer-Human Interface (CHI) Needs (decisions) Operational Techniques (Output) The Decision Maker Mobility Productivity Environment National Security Outcomes/Goals The Highway State of Deployed Resources System State of the Highway System + Weather Environmental Conditions FHWA/Mitretek Major STWDSR Documents FHWA Weather Team White Paper STWDSR V3.0/V4.0 TM/EM/Traveler Needs 1997-98 Impacts/Benefits Operational Test Requirements STWDSR V1.0 Needs 1999 Stakeholder Meetings STWDSR V2.0 Operational Concept Definition (OCD) Feb, May 2000 July, 2000 MDSS STWDSR V2.0 Preliminary Interfaces Requirements (PIR) October, 2000 10 FHWA/Mitretek STWDSR Documentation • Electronic Documents Library www.its.dot.gov/welcome.htm • White Paper (1998) • STWDSR V1.0 • STWDSR V2.0: Operational Concept Definition (OCD) • STWDSR V2.0 Preliminary Interface Requirements (PIR) • STWDSR V2.0 Executive Summary • Contact: gnelson@mitretek.org 11 FHWA/Mitretek STWDSR Needs Operational Scale Winter Road Maintenance STWDSR V1.0 53 Decisions Needs Matrix 44 User Groups Scales Warning Operational Planning 10 decisions 6 2 4 o i s i c e d ns Stakeholder Meetings: Value Added Met. Services (VAMS) Maintenance Managers (28 states) National Labs (6) 16 Clusters by Time Lead STWDSR V2.0 12 FHWA/Mitretek STWDSR Operational Concept Co llab o (Filtering, Fusion, Presentation) rat ive Tailored Decision Support Applications Ri s kD eci sio ns Learning Feedback Needs (Risk Decisions) Needs Risk (Decisions) Needs Highway Performance Goals (Risk Decisions) External Information Resources Transportation, Environmental, Treatment Assets 13 FHWA/Mitretek Open System Concept A display Swivelchair integration!!! Open System Decision Support Application Other ITS info A display Treatment Action! EIA* A display EIA* System Evolution Some Road Weather Processes EIA* Collection & Assimilation EIA* Some Environmental Sensor Station (ESS) Observations Roadway Environment Many Observations A Road Weather Information System (RWIS) Stovepipe 14 *Environmental Information Application Air/Sea Environment FHWA/Mitretek The Scale Concept Scales Time Horizon Functions Corresponding Weather Scale Winter RoadMaintenance Example Planning months + Provides resources. Climatic Buying equipment or chemical stocks; Hiring and training staff. Operational hours to days Manages the deployment of resources. Synoptic/meso Calling up crews, readying vehicles, dispatching treatment beats. Warning sub-seconds to minutes Operates the resources. Micro Operating a treatment vehicle (snow plow and spreader); Control of automatic equipment. 15 FHWA/Mitretek Needs (Decision) Clusters Cluster ID, Nam e Confidence % 2.A M onitor Conditions Aware Detect 2.B Prepare 2.C Get Ready 2.D Prepare E xpendables 2.E Select Strategy 2.F Assign Crews 2.G Prepare E quipm ent 2.H Activate Staff 2.I Initial Dispatching 2.J Contracting 2.K Prim ary Dispatching 2.L Rem edial Dispatching 2.M M id-Storm M anagem ent 2.N Discretionary Dispatching 2.O Term ination 2.P Cleanup 16 46 95 40 72 56 70 60 75 73 77 85 96 Tim e Lead hrs. 29.0 49.0 3.8 41.0 16.0 14.0 12.0 33.0 14.0 15.0 9.0 2.0 0.0 FHWA/Mitretek Maintenance Decision Support System (MDSS) Project • The MDSS is one realization of the STWDSR Operational Concept Definition (OCD) –For a set of functions and operational-scale decisions of winter road managers • Continues STWDSR stakeholder alliance – National Labs will develop non-exclusive components – State DOTs will operate – Vendors will provide and integrate into Road Weather Information System (RWIS) 17 FHWA/Mitretek MDSS Documentation • FHWA Road Weather Management Website www.ops.fhwa.dot.gov/weather/mdss.pdf • MDSS Project Plan •...with Labs’ contacts 18 FHWA/Mitretek Maintenance Decision Support System (MDSS) Project Federal Highway HighwaysAdministration Administration(FHWA) (FHWA) Office of Transportation Operation (HOTO) Mitretek Systems Gary Nelson AOTR: Rudy Persaud, HRDO-04 Paul Pisano PaulPisano, HOTO-1 Rudy Persaud Single Contract Cold Regions Research & Engineering Lab (CRREL) MDSS Programmatic Lead Lab George Blaisdell (Project Mgr.) Multiple Contracts MIT Lincoln Lab Bob Hallowell 19 NOAA National Severe Storm Lab National Center for Atmospheric Research (NCAR) MDSS Technical Lead Lab NOAA Forecast Systems Lab NOAA Environmental Technologies Lab John Cortinas Bill Mahoney (Project Mgr.) Rich Wagoner (Oversight) Paul Schultz Dan Wolfe FHWA/Mitretek Map to WIST-DSS Components Generate Scenario Monitor Conditions CRREL D NCAR D MDSS Road Weather Forecasting System (Environmental Threat Fusion) NSSL I FSL H Precipitation Algorithms CRREL E Chemical Conc. CRREL F Snow Drift CRREL B MDSS GIS Display System CRREL C MDSS Decision Support Concepts Video Processing Update Context External Information Resources Ensembles Numerical Models 20 MIT/LL G Road Conditions Present/Make Decision Existing Environmental Transportation and Treatment Asset Data Observing Systems ETL Observing System Assessment * Letters refer to Appendices of MDSS Project Plan FHWA/Mitretek MDSS: Benchmarks • Prototype Phase • 21 First Prototype Review, January at NCAR Second Prototype Review, now Prototype demonstration (September) Further Development Phase Notice of Intent (Federal Register, April) Next presentation FHWA/Mitretek Mitretek Support • DOT representative travel funding Submit original receipts!!! • Needs, OCD and PIR tracking • Monitor progress for FHWA • Work for recognition/support within surface transportation community Our job was to match expertise (National Labs) with user needs and vendor opportunities. From here on, this development track is up to the stakeholders. 22 FHWA/Mitretek