SMD Faculty Health and Safety Management Group (A sub-group of the QMUL Health & Safety Advisory Group) Peer Review Health and Safety Inspection Schedule 2013/14/15 Laboratory Room Numbers John Vane 305 /309 / 311 /313 / 322 / 327 / 331 / 332 / 334 Abernethy 215 Type of Laborato ry Centre / Unit Institute / Building Campus Date / Time of inspection Safety Coordinator Host/s Lab Manager / PI Host Inspection Team Volunteers (highlighted in yellow where volunteers needed) Lead Safety Adviser GM Lab/ s (Y/N) REPORT Biological, GM (CL1 / CL2) Biochemist ry HaematoOncology Barts Cancer Institute / John Vane Charterhous e Sq 07/05/2013 10 am – 12:30 pm Debbie Buckle / Dr Alex Sullivan (now Selina Blades) Dr Carol Jennings / Dr Jude Fitzgibbon, Dr David Taussig, Dr Jeff Davies, Dr Rifca Le Dieu Martin Goss, Sue Shaw Hawkins Dr Mark Ariyanayag am Y REPORT ISSUED 15 May 2013 Containme nt Level 3 (wild type and GM) Infectious Diseases Dr Jeff Maskell / Prof Graham Foster / Joe Davidson-Wright / Dr Matthias Dittmar Internal preinspection by OHSD prior to HSE visit Containm ent Level 3* Infectious Diseases Blizard Institute / Abernethy Blizard Institute / Blizard Whitechapel Whitechapel 21/05/2013 (note date change) 10 – 12:30 pm 21/05/2013 (note date change) SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 Dr Sam Benson (now Michael Schofield) Dr Sam Benson (now Dr Jeff Maskell / Prof Aine McKnight / Dr Internal preinspection by Dr Mark Ariyanayag am and Marion Richards Dr Mark Ariyanayag am and Y Y Action Plan Received and complete 08/01/14 COMBINED REPORT ISSUED 9 Aug 2013 Action Plan received 2 Feb 2015 – some actions still open COMBINED REPORT Blizard LG97, LG98, LG101 and LG102 Abernethy 215 and Blizard LG97, LG98, LG101 and LG102 Heart Centre Basement Floor Labs Francis Bancroft, Turnbull Centre Rooms Abernethy, Rooms R106, R134, R114, R111, R110, R109 14:00 – 16:00 (wild type and GM) Containm ent Level 3* (wild type and GM) Infectious Diseases Biological, GM (CL1 / CL2) Biochemist ry Teaching pathology, anatomy, chemicals Biological CL2, GM (CL1), Biochemist ry, chemicals Turnbull Centre Surgical Skills Centre (NCBRSI), Digestive Diseases Blizard Institute / Blizard Whitechapel 11 & 12/06/2013 (note date change) Michael Schofield) Dr Sam Benson (now Michael Schofield) Eithne O’Sullivan / Prof Tanya Parish OHSD prior to HSE visit Dr Jeff Maskell / Prof Graham Foster / Dr Matthias Dittmar / / Prof Aine McKnight / Prof Tanya Parish / Dr Eithne O’Sullivan / Joe Davidson-Wright HSE Inspection (Biological Agents Unit Inspectors) Marion Richards HSE Inspection ISSUED 9 Aug 2013 Y William Harvey / Heart Centre Charterhous e Sq 13/08/2013 10 am – 12:30 pm Dr Steven Coppen Ian Joy / Steven Coppen Dr Jeff Maskell, Dr John Marshall, Chris Evagora Dr Mark Ariyanayag am Y IHSE / Francis Bancroft Mile End 10/09/2013 10 am – 12:30 pm Steve Moore Rejwan Ahmed / Dr Catherine Molyneaux Dr Steven Coppen, Dr Sven (T.J.A) Van Eijl, Marcia Bennett Pompey Dr Paul Cassell N Blizard Institute / Abernethy Whitechapel 08/10/2013 10 am – 12:30 pm SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 Chris Pelling (now Michael Schofield) Debbie Hampson / Prof Gareth Sanger Dr Steven Coppen Deborah Buckle, Fraser Darling, Zarah Laing Action Plan received 02/02/2015– some actions still open COMBINED REPORT ISSUED 9 Aug 2013 Action Plan received 02/02/2015– some actions still open TO BE REPEATED – Autumn 2015 REPORT ISSUED 17 Oct 2013 Action Plan provided 14/03/2014 Dr Mark Ariyanayag am Y Completion report received REPORT ISSUED 05 Dec 2013 Action Plan Received and Completed 18/12/2013 Multiple locations – Mile End John Vane Basement / Ground, Rooms TBC John Vane, Rooms 113 main lab 111 decommissioned hot lab, no histology lab? 110 Autoclave room 110a dark room 112 equipment room 107 prep/ liquid nitrogen 106 & 108 cell culture rooms CL2 105 cold room 109 confocal microscope. Enclosed labs (north end) Blizard, Rooms LG112/113/114/11 5/116/117 Hazardous Waste Collection Areas / Stores Note - fourth Monday: 27/01/2014 1:30 – 3:30 pm Hazardous waste collection / storage areas – back of Francis Bancroft, Physics, Fogg, Eng, Joseph Priestley BSU Ch Sq Various Combined Sc & Eng and SMD Peer Review Inspection Mile End BSU / John Vane Charterhous e Sq POSTPONED until Autumn 2015 Biological, GM (CL1, 2), Biochemist ry chemicals Endocrinol ogy William Harvey Ch Sq 11/02/2014 10 am – 12:30 pm Biological, GM (CL1, 2) Biochemist ry, chemicals Immunolog y& Infectious Diseases and Digestive Diseases Biological, GM (CL1,2) In vivo work Sc & Eng: Sam Court / Jalal Hamdan / Chris Mole / John Dennis Jalal Hamdan / Sarah Cowls / Richard Rountree (SMD - BSU) / Erskine Greenidge (SMD - Dentistry), Rejwan Ahmed (SMD – Turnbull Centre) Kerry Horvath, Tim Kay; Dr Ruth Rose; Sam Court Dr Mark Ariyanayag am / Dr Paul Cassell Y (GM Wast e) REPORT DRAFT COMPLETED – RE-CHECK VISIT 27/02/2015 TO COMPLETE Geraldine Hansen Fraser Darling TBC Dr Mark Ariyanayag am Y POSTPONED Dr Steven Coppen Tom Milligan / Paul Chapple (now Leonardo Guasti) Jason Chattoo Chris Evagora Steve Cannon Dr Mark Ariyanayag am Y REPORT ISSUED – 12 SEP 2014 SMD: Geraldine Hansen (BSU), Steve Moore (IHSE) Action Plan Awaited Blizard Institute / Blizard Whitechapel 11/03/2014 10 am – 12:30 pm SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 Dr Jeff Maskell (now Michael Schofield) Dr Jeff Maskell Gill Adams Chris Evagora Dr Mark Ariyanayag am Y REPORT IN DRAFT Francis Bancroft, Rooms 2nd floor. Dental materials, Biological (CL1), Chemicals Dental Physics Dentistry / Francis Bancroft Mile End 08/04/2014 10 am – 12:30 pm Erskine Greenidge Erskine Greenidge / Prof Robert Hill Gwen Robinson Ian Joy Dr Matthew Golding Dr Mark Ariyanayag am N REPORT DRAFT ISSUED 2 Feb 2015 Action Plan Awaited Blizard, Rooms LG176/179 (flow cytometry); LG180/183/182/18 5/LG01/LG02/LG0 3/LG04 (microscopy) New Dental Teaching Laboratories Heart Centre – 1st floor Biological, GM, (CL1) Lasers, microscopy , flow cytometry Blizard Core Facility Labs Blizard Institute / Blizard Whitechapel Note Date Change 13/05/2014 10 am – 12:30 pm (Re-scheduled from Dec 2013) Michael Schofield Dr Jeff Maskell / Dr Anne Wheeler / Dr Gary Warnes Chemical / biological Dental Institute Whitechapel 18/11/2014 Kerry Newbury Dr Mike Cattell / Mrs Jayshree Brahmbhatt / Ronn Thomas Chemical / biological Wolfson Institute Heart Centre Ch Sq 09/12/2014 Cheryl Mason Prof Attila Lorincz Ellie Stewart Paul Carter Dr Steven Coppen, Dr Guglielmo Rosignoli Michael Schofield Jason Chattoo Robin Kerrigan Dr Matthias Dittmar Dr Paul Cassell and/or Marion Richards Y Mark Ariyanayag am N Zarah Laing N REPORT ISSUED 29 SEP 2014 Action Plan received and completed 22 Oct 2014 REPORT IN DRAFT REPORT ISSUED 15 JAN 2015 Action Plan received, most actions completed 23/2/2015 Cancer Inflammation Laboratories – John Vane Science centre Path Pharm Laboratories – QMUL embedded Barts Cancer – Drosophila Laboratories Chemical / Biological / GM (up to Class 2) Cancer Inflammati on Barts Cancer Institute Ch Sq 13/01/2015 Deborah Buckle / Selina Blades Dr Gavin Craig Chemicals / Biological Pathology Blizard Institute Whitechapel 10/02/2015 Chris Evagora Chemicals / Biological Haemato Onc / Tumour Biology Barts Cancer Charterhous e Square (Wed) 11/03/2015 Chris Evagora / Michael Schofield Deborah Buckle / Selina Blades SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 Dr Pedro Cutillas / Dr Paulo Ribeiro Dr Tyson Sharp (GMSC) Dr Steven Coppen Robin Kerrigan Gill Adams Robin Kerrigan Dr Sven (TGA) van Eijl Dr Dong Sheng Wu Robin Kerrigan Mark Ariyanayag am Y REPORT IN DRAFT Mark Ariyanayag am Mark Ariyanayag am N REPORT IN DRAFT Y REPORT IN DRAFT Heart Centre Basement 1st floor Labs - WHRI Chemicals / Biological Various Centres William Harvey Charterhous e Square POSTPONED UNTIL AUTUMN 2015 (originally scheduled for 14/04/2015) Steven Coppen Ian Joy / Steven Coppen Blizard courtyard areas and related Storage / gas cylinders / LN2 / post room / clinical waste Communal facilities Blizard Whitechapel POSTPONED UNTIL AUTUMN 2015 (originally scheduled for 12/05/2015) Michael Schofield Michael Schofield Original volunteers Cheryl Mason Andrew Palfreeman Dr James Whiteford, Dr Gavin Craig Original Volunteers Cheryl Mason Andrew Palfreeman Fraser Darling Mark Ariyanayag am Y POSTPONED Mark Ariyanayag am Y (GM waste only) POSTPONED H&S Peer Review Inspection - Introduction 1. The SMD ‘higher risk’ areas (laboratories, workshops, ‘communal’ areas where hazardous substances are handled – e.g. hazardous waste collection areas) are covered by H&S Peer Review inspections (Note - Lower risk areas (e.g. office rooms) are covered by each Institute’s H&S self-inspection schedule. Institute H&S self-inspection reports may be requested during peer review inspections). 2. These H&S Peer Review Inspections fit into the QMUL’s overall H&S Audit & Inspection programme (see pp 9 & 10 of the QMUL H&S Audit and Inspection Standard at http://www.ohsd.qmul.ac.uk/documents/standard/64341.pdf ) 3. To keep to a consistent timetable, SMD H&S Peer Review Inspections are scheduled for the second Tuesday of each month, for an am (10 am - 12:30 pm) slot. If the date / time are not suitable, then every effort will be made to find a suitable slot in that week close to the second Tuesday of the month. Hosts - please contact Mark Ariyanayagam m.r.ariyanayagam@qmul.ac.uk if a change is needed. 4. All inspections are to a maximum of 2.5 hours, inspections to be approximately of 2 hours duration. 5. A Minimum of 3 persons in the inspection team, maximum of 5 persons. 6. At least one member of the inspection team to be a (Lead) Safety Adviser, knowledgeable on the safety requirements of the laboratory / area. SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 7. Volunteers for the Peer Review Inspection are sought from Safety Coordinators, Lab / Technical Managers / staff, Academic and Research staff with an interest in Laboratory Health and Safety (e.g. members of an Institute H&S Committee, laboratory safety grouping). A volunteer can join the inspection team for a laboratory / area that are not under their Institute’s control (‘exemptions’ will be made for ‘shared / communal’ (e.g. hazardous waste areas) areas). If you can volunteer, please email Mark Ariyanayagam m.r.ariyanayagam@qmul.ac.uk, noting which inspection/s you can join. Preparation for the H&S Peer Review Inspection 8. The local safety rules document as an electronic document (or web link to the document) and 2 sample risk assessments as electronic documents (or web link / database reference ID if available online) from the lab / area to be inspected must be sent to Mark Ariyanayagam m.r.ariyanayagam@qmul.ac.uk at least a week in advance by the host Safety Coordinator (please note normally there won’t be a reminder for this action, other than this document). 9. Required information on entry restrictions, health surveillance / monitoring required for the area, PPE that cannot be provided by the host or other significant safety measures required for the area should be noted to Mark Ariyanayagam m.r.ariyanayagam@qmul.ac.uk at least a week in advance by the host Safety Coordinator. 10. Mark Ariyanayagam will distribute the above documents (or weblinks) and any other required information to the inspection team as preparatory information. 11. The Inspection team should also print out the H&S Peer Review Inspection checklist/s at http://www.ohsd.qmul.ac.uk/documents/Checklists/101434.docx H&S Peer Review Inspection 12. The Inspection Team to meet at the Nucleus Cafe (for Whitechapel) or The Shield (for Charterhouse Sq) or The Ground Café (for Mile End) at 9.30 am on the inspection day (or 30 mins before the inspection if the start time is not 10 am) for a coffee and briefing by the Lead Safety Adviser. 13. The H&S Peer Review Inspection checklist to be used is on the OHSD website at http://www.ohsd.qmul.ac.uk/documents/Checklists/101434.docx 14. Where required, additional checklists (e.g. GM / CL3) are also available on the OHSD web page http://www.ohsd.qmul.ac.uk/services/Inspection%20and%20Monitoring/Inspections%20-%20Checklists/index.html . SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 15. The Inspection team will follow instructions from the host on safety (incl PPE) / entry requirements for the inspection. Standard PPE (e.g. lab coat, eye protection) will be provided by the host. 16. In addition to the above requested H&S documents, it would be expected that H&S documents for the lab / area (e.g. risk assessments, safety rules & arrangements, safety data sheets, inventories of hazardous substances, local exhaust ventilation (e.g. fume cupboards, microbiological safety cabinets) test certificates) are easily accessible / available in the lab for viewing by the Inspection Team. 17. At the end of the inspection time slot, ‘key points’ will be noted verbally to the host/s by the Inspection Team. H&S Peer Review Inspection Report 18. The Inspection Report is to be drafted by a volunteer from the inspection team using the template at the above webpage, with input from the rest of the inspection team. Guidance to draft the Inspection Report is also found on the same web page. 19. The Inspection report will normally be submitted to the relevant Institute Director and copied to the Faculty Vice Principal, within 20 working days from the Inspection date. If there are delays to this schedule, the Institute Director will be informed. 20. Where recommendations to improve safety are identified in the report, an action plan will be requested from the Institute Director to ensure remedial actions are implemented. The Inspection Report, Action Plan and subsequent Completion of Actions should be included in the Institute’s reports to the Faculty Safety Group. ● Containment Level 3 (CL3) / Genetic Modification (GM) work 21. The Containment Level 3 Peer Review inspections will be primarily based on the laboratory infrastructure requirements. The Biological Safety Adviser (Mark Ariyanayagam) will also conduct a separate document / safety management audit of the CL3 facility / work (to be arranged separately with the relevant Principal Investigator/s and Institute Lab Management) and will write the final report/s for this inspection. The specific CL3 inspection checklist is at the web page noted above. 22. For the Blizard Containment Level 3 suite (LG97, LG98, LG101 and LG102), individuals may need health clearance from QMUL Occupational Health (contact Mark Ariyanayagam to ascertain requirements). 23. Where there is a GM element to any lab’s work, at least one member of the QMUL GMSC will be in the inspection team. The GM Inspection checklists are at the web page noted above. 24. The GM part of the inspection report will be submitted to QMUL GM Safety Committee for review. SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015 Ionising Radiation 25. Designated Ionising Radiation laboratories (Supervised / Controlled Areas) will NOT be inspected under this Inspection Schedule (these will be inspected separately under specialist Ionising Radiation inspections arranged by the QMUL Radiation Protection Manager and Radiation Protection Adviser). It is noted that there may be Ionising Radiation sources present (e.g. within equipment, as teaching aids) in some non-designated laboratories. SMD H&S Peer Review Inspection Schedule –UPDATED 11 May 2015