Mayor Jacobs has directed County staff to
maintain and enhance the County’s
coordinated, comprehensive, and consistent
response to pedestrian and bicycle safety issues.
Presentation Outline
 Program Overview
 Coordination
 Capital Planning
 Codes
 Implementation
Program Overview
Metro Orlando tops the list of most
dangerous areas to walk in 2014.
Program Overview
Orange County Pedestrian/Bicycle Crashes
 Jan. 1, 2006-Feb. 1, 2015
 1,574 crashes in the dark (32%)
 4,968 total crashes
 4,083 injuries (82%)
 750 crashes from
aggressive/distracted driving (15%)
 256 fatalities (5%)
 348 crashes from drugs/alcohol (7%)
Source: Signal Four Analytics Crash
Database, Accessed February 2, 2015.
Program Overview
Coordinate Existing County Activities
 Public Works ADA Compliance Initiative/Transition Plan
 Road Safety Audits/Safety Studies
 Roadway Lighting Program
 School/Pedestrian Safety Projects
 Community Traffic Safety Team
 Best Foot Forward and MetroPlan Orlando
funding and coordination
Coordination
Existing Programs/Agencies
 Safety Studies done by Orange County Public Schools
(OCPS)
 Public Outreach done by Best Foot Forward
 Crosswalk enforcement and education in schools
handled by Best Foot Forward, OC Sheriff’s Office, OCPS
Program Overview
New Program Activities
Coordination
Capital
Planning
Codes
Coordination
New Program Activities
 Expand current efforts with new County planning and
engineering activities
 Jointly pursue training and grant opportunities
 Work with Best Foot Forward, Orange County Public
Schools, MetroPlan Orlando, FDOT, cities
Coordination
New Program Activities
 Logo and outreach materials
(English, Spanish, Haitian Creole)
 Media outreach/Orange TV
 Website/Mobile application
 Outreach at County community
meetings/events
Coordination
Mayor Jacobs’ Initiatives
 Sustainability Plan focus on pedestrian
safety and livability
 Mayors’ Challenge focus on safety,
biking /walking data collection, and
education
Coordination
Mayor Jacobs’ Initiatives
 INVEST in Our Home for Life commitment to
pedestrian safety projects
 Funding for crossings, intersections, other needs
 Walk Ride Thrive! Program helps identify needs
Capital Planning
Collect
Data
Evaluate
Data
Select
Select Counter-
Corridors
measures
Monitor
Effectiveness
Implement
and
Benefit-Cost
Ratio
Capital Planning
Road Safety Audits (RSAs) and Studies
 Detailed area/corridor studies
 Identify safety improvements with community input
 County RSA completed: Northwest, Bithlo/Christmas,
Waterford Lakes, Texas-Americana
Capital Planning
Safety Project Highlights
 UCF Area, Pine Hills, and Oak Ridge Preliminary
Engineering projects underway or planned
 Rectangular Rapid Flashing Beacon
(RRFB) installations
 International Drive Walkability Analysis
Capital Planning
New Program Activities
 “Safety CIP” to fund identified safety projects
– Add safety enhancements to standard engineering plans
– New safety features for new/widened roadways
 Biking/walking data collection
Budget
FY 2015—2016
• Pedestrian/Bicycle Safety Action Plan
• Pedestrian/Bicycle Data Collection
• Pine Hills Road Preliminary Engineering
• UCF Area Preliminary Engineering
• Oak Ridge Road Preliminary Engineering
$25,000
$15,000
$300,000
$357,000
$300,000
Budget
FY 2016—2017
• Pine Hills Road Final Engineering
• Oak Ridge Road Final Engineering
• UCF Area Final Engineering
$500,000
$500,000
$500,000
FY 2017—2018
• Pine Hills Road Construction
• Oak Ridge Road Construction
$1,200,000
$1,200,000
FY 2018—2019
• UCF Area Construction
Note: Preliminary estimates
$3,500,000
Codes
Existing County Activities
 Ch. 38 (Zoning Code) pedestrian/bicycle site
development standards updated in 2013
 Comprehensive Plan policies
 ADA Compliance Initiative code updates
 Forthcoming Sustainable Land Development Code
project
Codes
Add New Program Activities
 Pedestrian and Bicycle Safety Action Plan
 Complete Streets Policy and Manual coordinated with
FDOT/MetroPlan Orlando
 Pedestrian related code changes
– Site development standards (ex. driveway markings)
– Student housing/pedestrian-oriented land uses
– ADA and access management
Implementation
Implementation
Program Summary
 RSA, planning, and coordination already
underway
 Outreach materials/multimedia in development
now
 Communications Plan in place with
Communications Division
 BCC work session in August
Implementation
Program Summary
 “Safety CIP” and new Safety coordinator in FY
15-16
 Pedestrian/Bicycle Safety Action Plan in FY 15-16
 Coordination with US DOT Mayor’s Challenge
through March 2016